
Ob Chav Wing 700 Expandable House
Kwv yees li. 7.5m x 7.5m nthuav hneev taw nrog approx. 2.8m sab hauv qhov siab rau qhov loj-ntim nyob, tos txais qhua thiab qhov project.
Thov Qauv Paub meejMovable, foldable modular tsev uas qhib los ntawm ob sab los tsim qhov chaw siv tau loj dua rau kev nyob, kev ncig xyuas, kev tsim kho camps, tej yaam num xwm txheej ceev thiab kev lag luam.
Lub tsev ob-tis expandable yog lub tsev txav, foldable integrated tsev. Tom qab qhov chaw crane, ob lub tis qhib thiab muaj kev ruaj ntseg nrog bolts, hloov lub compact shipping lub cev mus rau hauv ib tug dav dav npaj-rau-haum qhov chaw nrog ntau qhov chaw ua hauj lwm tsawg tshaj li cov pa ib ntus kev tsim kho.
Xa cov kev xav tau ntawm qhov projectLub rooj sib piv qhov muaj qhov loj me. Folded loj thiab loading kom muaj nuj nqis yog paub tseeb hais tias tom qab qhov kawg daim duab thiab packing txoj kev npaj raug tshuaj xyuas.
| Qauv | Expanded Loj | Qhov siab / Sab hauv siab | Folded Loj | Hauv pem teb | 40HQ Chaw thau khoom |
|---|---|---|---|---|---|
| Ob chav Wing 700 | Kwv yees li. L7500 x W 7500 mm | Sab hauv approx. 2800 hli; sab nraud approx. 3100 hli | Paub meej nrog qhov kawg engineering | Muab xam hneev taw approx. 56,25m wb | Paub meej nrog qhov kawg configuration |
| 20ft Ob Chav Wing Lub Tsev | L5900 x W6300 x H2480 mm | H2480 hli | L5900 x W 2200 x H 2480 mm | Kwv yees li. 37sqm ua | 2 teeb rau 40HQ |
| 30ft Ob Chav Wing Lub Tsev | L9150 x W6300 x H2480 mm | H2480 hli | L9150 x W 2200 x H 2480 mm | Kwv yees li. 54sq ua | Paub meej nrog qhov kawg configuration |
| 40ft Ob Chav Wing Lub Tsev | L11800 x W6300 x H 2480 mm | H2480 hli | L11800 x W 2200 x H 2480 mm | Kwv yees li. 74sq ua | 1 teeb rau 40HQ |
Daim ntawv ceeb toom txog qhov project: cov nqi tseeb saum toj no yog npaj los ntawm cov khoom lag luam tam sim no. Ob chav Wing 700 hauv pem teb yog ib qho yooj yim 7.5m x 7.5m hneev taw suav; zaum kawg usable cheeb tsam nyob ntawm qhov ntau lawm daim duab.
Plaub daim npav ua raws li cov qauv tam sim no. Cov duab khoom yog cov qauv ntawm lub Hoobkas thiab qhia txog kev ua tiav tiav; qhov kawg qhib thiab qhov tshwm sim ua raws li daim duab pom tseeb.

Kwv yees li. 7.5m x 7.5m nthuav hneev taw nrog approx. 2.8m sab hauv qhov siab rau qhov loj-ntim nyob, tos txais qhua thiab qhov project.

Tus qauv export-oriented qauv rau tsev neeg nyob, kev pab neeg ua hauj lwm, chaw ua hauj lwm chaw ua hauj lwm thiab ntau modular layouts.

Ib qho kev xaiv nruab nrab rau cov neeg yuav khoom uas xav tau chav ntau dua li 20ft qauv yam tsis tau txav ncaj qha mus rau 40ft hneev taw.

Cov npe loj tshaj plaws hauv kev xaiv rau ntau chav tsev, kev ncig xyuas, kev lag luam thiab cov tsev neeg loj dua.
Cov qauv tam sim no qhia txog tus ncej, phab ntsa, qhib, pem teb thiab lub Hoobkas ua tiav cov kev pabcuam cov neeg yuav khoom yuav tsum paub meej ua ntej hais.
Q235 galvanized steel los yog txias-tsim nyias-phab ntsa hlau nrog electrostatic hmoov txheej rau cov qauv muaj zog thiab tiv thaiv corrosion.
EPS sandwich panels, pob zeb wool panels thiab hlau-faced composite phab ntsa xaiv tau raug teev tseg, suav nrog Chav Kawm A hluav taws-kev ua haujlwm pob.
Thermal-break aluminium casement lossis zawv zawg qhov rooj, PVC lossis titanium-magnesium alloy qhov rais, nrog ob-glazed tempered iav xaiv.
SPC flooring los yog ntoo-grain pem teb npog xaiv rau hnav tsis kam, tu thiab ntub qhov chaw.
Khoom noj khoom haus-qib PPR dej yeeb nkab, pre-routed hluav taws xob conduit, sockets thiab interfaces yuav tsum tau npaj nyob rau hauv lub Hoobkas rau qhov chaw sib txuas.
Chav pw, chav nyob, L-zoo li chav ua noj, chav dej qhuav-ntub cais, teeb pom kev zoo, qhov cua thiab cov rooj tog-npaj zones tuaj yeem sib koom ua ke.
Xaiv siv, layout, tiav thiab kom muaj nuj nqis. Cov cuab yeej pom zoo ob chav Wing 700, 20ft, 30ft lossis 40ft thiab hloov qhov tshwm sim rau hauv daim ntawv RFQ.
Qhov no selector muab tus qauv pib taw tes. Tus nqi kawg tseem nyob ntawm qhov chaw, pob khoom, kom muaj nuj nqis thiab cov phiaj xwm hauv zos.
Feem ntau xaiv rau tsev neeg nyob, chaw ua hauj lwm thiab cov txheej txheem kev pab cuam.
Loj layouts rau so cabins, pab pawg tsev nyob thiab coj mus muag-siv interiors.
Xaiv facade kev ntxhib los mos thiab xim kev taw qhia rau qhov project lag luam, kev nyab xeeb, qhov chaw ib puag ncig thiab cov neeg yuav khoom hauv zos nyiam.
Qhib kev teeb tsa tuaj yeem hloov kho rau kev nyab xeeb, qhov cua, nruab hnub, kev nkag mus thiab kev sib txuas ntawm lub tsev.
Lub tsev tuaj yeem ua lub Hoobkas ua tiav rau kev npaj-rau-txuas siv, nrog rau kev faib chav thiab cov ntsiab lus pabcuam ua haujlwm ua ntej tsim khoom.
Kev xaiv cov khoom siv pab cov neeg yuav khoom sib piv cov qib tiav thiab cov kev xav tau kev saib xyuas ua ntej hais.
Cov txheej txheem txuas ntxiv tuaj yeem ua rau lub hauv paus chav tsev tsim nyog rau cov chaw so, chaw pw hav zoov, chaw tos txais kev lag luam thiab cov haujlwm nyob ntev.
Qhia peb tus qauv loj, npaj hauv pem teb, sab hauv vaj huam sib luag, vaj huam sib luag sab nrauv, pem teb board, kho kom zoo nkauj theem, hluav taws xob scope thiab lub teb chaws lo lus uas peb. Peb tuaj yeem tshuaj xyuas qhov teeb tsa thiab teb nrog cov lus qhia meej dua.
Tom qab muab tso rau, ob lub tis qhib thiab muaj kev ruaj ntseg nrog bolts, txo cov kev lag luam ntub dej thiab cov chaw ua haujlwm nyuaj.
Lub 20ft lub cev folds mus rau 2200mm dav thiab nthuav mus rau 6300mm; 20ft loads 2 teeb ib 40HQ thiab 40ft loads 1 teeb.
Chav ua noj, chav dej, PPR cov kav dej, cov kev siv hluav taws xob, hauv pem teb, qhov rooj thiab qhov rais tuaj yeem npaj ua ntej xa khoom.
Nrog rau kev ua haujlwm thiab kev saib xyuas kom zoo, folding system tuaj yeem txhawb nqa txog 500 folding cycles thiab 10-30+ xyoo kev pabcuam-lub neej.
Cov kev xaiv muaj xws li sealing, rwb thaiv tsev, waterproofing, ya raws / corrosion tiv thaiv, hluav taws kub thiab seismic / cua kev ua haujlwm pob.
Lub Hoobkas-tsim system tuaj yeem txo qhov chaw ua haujlwm, kev tswj xyuas ib ntus thiab kev sib koom ua ke piv nrog cov kev daws teeb meem ntawm qhov chaw.
Cov duab no yog siv los ua kev tsim khoom thiab ua tiav cov ntaub ntawv. Tus qauv loj, qhov qhib thiab pob façade yuav tsum ua raws li daim duab pom zoo.





Repeatable chav rau infrastructure, mining thiab tej thaj chaw deb chaw ua hauj lwm pab neeg nyob.
Fast ntxiv qhov chaw nyob nrog chav pw, chav nyob, chav ua noj thiab chav dej zoning.
Kev cai facades, porch / lawj xaiv thiab ua tiav interiors rau kev xauj tsev thiab tos txais cov haujlwm.
Cov khw kas fes, chav sauna, chaw txais tos, chaw muag khoom me me thiab chav ua lag luam ib ntus.
Kev xa tawm sai sai, thaj chaw pabcuam thiab chaw pabcuam thaum muaj xwm txheej ceev.
Cov qauv, cov khoom siv thiab cov kev xaiv thauj khoom tau tsim los rau kev xa tawm txawv teb chaws thiab qhov project.
Kev nug kom muaj zog yuav tsum kaw cov qauv tam sim no, qauv, rwb thaiv tsev, chav npaj, MEP tus qauv, tiav pob thiab lo lus uas peb ua ntej ntau lawm.
Paub meej tias lub teb chaws, huab cua, qhov chaw siv, kev cia siab hauv zos thiab lub hom phiaj hnub xa khoom.
Xaiv Ob Chav Wing 700, 20ft, 30ft lossis 40ft siv thaj chaw, qhov siab, chaw thau khoom thiab chav tsev.
Paub meej tias chav sib faib, qhib, Q235 ncej, phab ntsa rwb thaiv tsev, pem teb, chav ua noj, chav dej thiab hluav taws xob.
Ua thav duab, panels, tiav thiab cov khoom siv sib xyaw ua ke, tom qab ntawd tshuaj xyuas cov qauv, qhov ntev, qhov qhib thiab cov kev pabcuam.
Npaj cov phiaj xwm thauj khoom, suav cov khoom, kos duab, duab / yeeb yaj kiab thiab kev taw qhia ntawm qhov chaw sib txuas.
Ob chav-tis expandable tsev yog heev configurable. Ib qho kev tsocai yuav tsum pib los ntawm lub hauv paus loj, chav layout, sab nrauv tiav thiab cov lus qhia uas yuav tsum tau ua.
Xaiv Ob Chav Wing 700, 20ft, 30ft lossis 40ft, tom qab ntawd paub meej tias chav pw, chav nyob, chav dej, chav ua noj thiab qhib txoj haujlwm.
Xa cov phiaj xwm pem teb xav tauPaub meej tias cov phab ntsa vaj huam sib luag, sab nrauv kev ntxhib los mos, hauv pem teb tiav, thermal-so qhov rooj, qhov rais hom, chav dej pob thiab hluav taws xob configuration.
Paub cov ntaub ntawvQhia tawm lub teb chaws lo lus uas peb, kom muaj nuj nqis, lub sijhawm xa khoom, kev nyab xeeb thiab txhua qhov kev xav tau hauv zos rau kev ua haujlwm cua, seismic lossis hluav taws.
Npaj QuotationCov qauv tseem ceeb suav nrog Ob Chav Wing 700, 20ft, 30ft thiab 40ft. Qhov 20ft, 30ft thiab 40ft nthuav dav qhov ntau thiab tsawg yog 5900 x 6300 x 2480 mm, 9150 x 6300 x 2480 mm thiab 11800 x 6300 x 2480 mm.
Tom qab qhov chaw crane, ob lub tis yog qhib thiab ruaj ntseg nrog bolts. Lub hauv paus ntawm qhov chaw, kev siv hluav taws xob sib txuas thiab kev teeb tsa hauv zos yuav tsum tau lees paub ua ntej xa khoom xa tuaj.
Ib tug 20ft qauv feem ntau loads 2 teev ib 40HQ, thaum lub 40ft qauv feem ntau loads 1 teeb ib 40HQ. Chaw thau khoom rau Ob Chav Wing 700 thiab 30ft yuav tsum tau lees paub los ntawm qhov kawg configuration.
Muaj cov thav duab thiab phab ntsa xaiv suav nrog Q235 galvanized steel, txias-tsim nyias-phab ntsa hlau, 50mm / 65mm EPS sandwich panels, pob zeb wool panels thiab hlau-faced composite phab ntsa.
Yog lawm. Cov chav sib faib, L-shaped chav ua noj, chav dej, PPR cov yeeb nkab dej, cov kev siv hluav taws xob, cov qhov (socket), hauv pem teb, qhov rooj thiab qhov rais tuaj yeem sib koom ua ke raws li lub Hoobkas ua tiav pob.
Yog lawm. Ob chav pw-ib-nyob, peb chav pw-ib-nyob thiab lwm yam kev npaj tuaj yeem tsim. Daim duab kos yog xav tau rau 30ft, Ob Chav Wing 700 thiab cov qauv tsis yog qauv.
Nrog rau kev ua haujlwm thiab kev saib xyuas kom zoo, folding system tuaj yeem txhawb nqa txog 500 folding cycles thiab 10-30+ xyoo kev pabcuam-lub neej. Lub neej tiag tiag nyob ntawm tus qauv, tiav, kev nyab xeeb, siv thiab tu.
Cov pob khoom muaj xws li Qib 8 seismic, Qib 12 typhoon thiab Class A kev ua haujlwm hluav taws kub. Kev ua raws cai zaum kawg yuav tsum raug txheeb xyuas raws li kev pom zoo, cov ntaub ntawv engineering thiab cov cai ntawm qhov chaw.
Xa lub teb chaws, daim ntawv thov, qauv, kom muaj nuj nqis, layout, ncej / phab ntsa pob, sab nrauv, chav ua noj / chav dej, qhov hluav taws xob, khoom siv thiab lub hom phiaj xa khoom hnub.
Yog lawm. Cov kev xav tau ntawm qhov chaw tuaj yeem raug tshuaj xyuas ua ntej kev hais lus, suav nrog kev teeb tsa, kev thauj khoom, cua, seismic, hluav taws xob thiab hluav taws xob xav tau rau kev lag luam xaiv.
Daim ntawv luv luv sau cov ntaub ntawv tseem ceeb ua ntej. Cov ncauj lus kom ntxaws, pob khoom thiab cov khoom siv tuaj yeem lees paub nrog pab pawg muag khoom tom qab kev tshuaj xyuas thawj zaug.