Factory-prefabricated qhov chaw capsule tsev rau homestays, chaw so thiab kev lag luamQhov ntau thiab tsawg, kev xaiv sab hauv, kev thauj mus los tag nrho thiab qhov chaw txhawb nqa
Prefabricated qhov chaw capsule tsev

Space Capsule Houses rau Resorts thiab Homestays

Yav tom ntej-styled modular chav ua nyob ib ncig ntawm kub-dip galvanized steel ncej, insulated hnab ntawv thiab panoramic LOW-E glazing. Cov chav nyob tuaj yeem teeb tsa nrog kev ua tiav sab hauv, chav dej, HVAC thiab kev xaiv ntse tswj, tom qab ntawd thauj mus rau qhov chaw raws li cov qauv ua tiav.

19/28/36.8 m²Standard ib-storey pem teb cheeb tsam.
Raws li me me li 2-4 teevKev nqa, qhov chaw thiab kev siv hluav taws xob txuas thaum lub xaib tau npaj txhij.
Tag Nrho-Unit DeliveryFactory-prefabricated module thauj tsis tau dismantling.
Qhov chaw capsule sab nrauv ntawm qhov chaw roob
Space capsule forest deck unitSpace capsule nrog panoramic lawjQhov chaw capsule chav pw sab hauv
7.5 / 8.5 / 11.5 mStandard ib-storey ntev ntev
50-100 hliCov kev xaiv rwb thaiv tsev sib xyaw
LOW-E iavOb chav insulated tempered panoramic glazing
Kev xaiv ntseLub suab tswj, hluav taws xob curtains thiab scene hom
Cov khoom muag

Ib chav ua tiav modular tsim rau scenic kev pab thiab kev lag luam siv.

Cov khoom siv kub-dip galvanized steel thav duab nrog ib qho txhuas lossis galvanized-steel sab nrauv plhaub, cov khoom siv hluav taws xob sib xyaw thiab qhov qhib dav glazed. Nyob ntawm qhov kev txiav txim, lub Hoobkas tuaj yeem ua ke cov khoom siv sab hauv, cov khoom siv hauv chav dej, dej thiab hluav taws xob, cua txias, rooj tog zaum thiab ntse tswj ua ntej xa.

Homestay thiab resort sivKev thauj mus los tag nrhoPanoramic glazingConfigurable interiors
Distinctive qhua kevQhov nkhaus sab nrauv thiab panoramic glazing tsim ib chav pom zoo rau cov haujlwm scenic thiab tos txais qhua.
Npaj-txhawb installationCov txheej txheem kev teeb tsa tus qauv siv kev teeb tsa ntawm kev npaj txhawb nqa ko taw yam tsis muaj lub hauv paus ua haujlwm nyuaj; kev txhawb nqa zaum kawg yuav tsum haum rau qhov chaw thiab av.
Factory-integrated haum-tawmKev ua tiav sab hauv, cov khoom siv hauv chav dej, HVAC, dej thiab hluav taws xob tuaj yeem ua ke ua ntej xa tawm thaum suav nrog hauv kev txiav txim.
Kev hloov chaw tag nrhoQhov ua tiav module tuaj yeem nqa thiab rov ua haujlwm thaum nkag mus, crane muaj peev xwm thiab kev siv hluav taws xob cuam tshuam tso cai.
Ua kom tiav technical specifications

Space Capsule House Technical Parameters

ParameterSpecification
Dimensions thiab hluav taws xob Load
Standard Zuag qhia tag nrho Dimensions7.5 × 3.3 × 3.2 m / 8.5 × 3.3 × 3.2 m / 11.5 × 3.3 × 3.2 m
Hauv pem tebKwv yees li. 19 m² / 28 sqm / 36.8 sqm
Ob chav-storey OptionKwv yees li. 80-100 m²; qhov project tshwj xeeb qhov ntev thiab cov qauv
Ua tiav Chav Qhov hnyavKwv yees li. 5.8-9 t; Nws txawv ntawm qhov loj me thiab teeb tsa
Rated Hluav taws xob LoadKwv yees li. 11.5 kW tsi
Hluav taws xob Load nrog pem teb cua sovKwv yees li. 17 kWm
Lub tsev thiab lub hnab ntawv
Main Structural NcejKub-dip galvanized steel ncej
Sab nrauv PlhaubFluorocarbon-coated aluminium ntawv / galvanized steel ntawv
Rwb thaiv tsev CorePU / PIR / XPS puas vaj huam sib luag
Rwb thaiv tsev Thickness50-100 hli
Thermal conductivityK <0.45 W/(m²·K)
GlazingOb chav insulated LOW-E tempered iav
Pem teb tiavMarble-zoo li flooring / SPC flooring
WaterproofingRau-txheej waterproofing system nrog sealing strips, waterproof txheej thiab structural drainage
Sab hauv, Utilities thiab khoom siv
Hluav taws xob Standard220 V; qhov chaw voltage thiab zaus xav tau kev pom zoo
Cov kav dej thiab hluav taws xobPPR cov kav dej / PVC cov kav dej
Common Sab Hauv LayoutIb chav pw + ib chav pw + ib chav dej; saib lawj lossis chav ua noj bar yeem
Chav dej pobQhuav-ntub sib cais, saib iav heev, daim iav, chav dej thiab da dej fittings
HVAC thiab cov khoom sivCentral cua txias, dej rhaub thiab tub yees; configuration-nyob
Smart-Control OptionsLub suab tswj, daim npav fais fab, scene hom thiab hluav taws xob curtains; hluav taws xob skylight yeem
Kev ua tau zoo
Seismic ResistanceQib 7-9 xaiv; paub meej los ntawm qhov kawg structural engineering
Cua ResistanceQib 10-12 xaiv; paub meej los ntawm qhov kawg structural engineering
Suab rwb thaiv tsev35-55 dB ntau
Hluav taws kub tsis kamMuaj kev xaiv: ≥4 h
Ua haujlwm kub-45 ° C mus rau 45 ° C kev khiav hauj lwm ntau yam
Kev Pabcuam Lub Neej30-50 xyoo; raws li cov khoom siv, ib puag ncig thiab kev saib xyuas
Kev thauj mus los thiab kev teeb tsa
Factory Prefabrication Rate≥90%
Txoj kev thauj mus losTag nrho lub tsheb thauj mus los yam tsis muaj dismantling
Kev Ua Haujlwm Hauv TsevCrane positioning, kev txhawb nqa kev hloov kho thiab dej, lub zog thiab cov dej sib txuas
Lub Sijhawm Txhim KhoTsawg li 2-4 teev thaum nkag mus, crane, kev txhawb nqa thiab kev siv hluav taws xob tau npaj txhij
Txhawb nqa / FoundationKev them nyiaj yug-ko taw installation lossis qhov chaw tshwj xeeb engineered txhawb tsim
Hloov chawTag nrho chav tsev nqa thiab tshem tawm kev txhawb nqa thaum txoj kev thiab crane tej yam kev mob tso cai
Tag nrho cov nuj nqis yog kev npaj cov khoom muaj nqis rau kev hais lus thiab kev tshuaj xyuas qhov project. Paub meej qhov kawg qhov ntev, ua tiav qhov hnyav, kev ua haujlwm ntawm cov qauv, hluav taws xob thauj khoom, kev txhawb nqa tsim thiab kev ua raws cai hauv zos hauv cov lus hais thiab pom zoo kos duab.
Khoom configurations

Xaiv tus qauv loj ua ntej lees paub lub pob sab hauv

Qhov loj me, glazing kev npaj, chav dej, chav ua noj bar, HVAC, rooj tog thiab ntse-tswj kev xaiv tag nrho cuam tshuam qhov hnyav ua tiav, hluav taws xob thauj khoom thiab kev npaj xa khoom.

Lit space capsule park qauv

7.5 m Capsule House

Qhov tsawg tshaj plaws ib-storey tsev loj, haum rau ib tug compact homestay chav, private chaw ua hauj lwm los yog chaw tos txais.

Kwv yees li. 19sqm uaHauv pem teb
7.5 × 3.3 × 3.2 mTxheem Loj
Ib-storeyCompact layoutKev xa khoom tag nrho
Xaiv Qhov Kev Xaiv no
Space capsule panoramic iav facade

8.5 m Capsule House

Ib qho kev xaiv nruab nrab rau cov qhua suite nrog chav dej ntiag tug, chaw so thiab xaiv cov cuab yeej ntse.

Kwv yees li. 28 sqmHauv pem teb
8.5 × 3.3 × 3.2 mTxheem Loj
Guest suitePanoramic glazingKev xaiv ntse
Xaiv Qhov Kev Xaiv no
Qhov chaw capsule sab nrauv ntawm qhov chaw roob

11.5 m Capsule House

Qhov ntev tshaj plaws ib-storey tsev loj, nrog ntau chav rau ib tsev neeg-taw qhia kom haum suite, cia los yog ua lag luam functions.

Kwv yees li. 36,8m wbHauv pem teb
11.5 × 3.3 × 3.2 mTxheem Loj
Chav tsev loj duaTsev neeg layoutChav ua noj-bar xaiv
Xaiv Qhov Kev Xaiv no
Roob chaw capsule stilt pawg

Ob chav-storey Capsule House (Custom)

Ib qhov project-specific ob-theem configuration rau tsev neeg suites los yog pab neeg kev pab, yuav tsum tau rau siab structural, txhawb nqa thiab thauj engineering.

Kwv yees li. 80-100 m²Npaj cheeb tsam
Qhov project tshwj xeebEngineering Status
Ob chav tsevKev cai qauvTxoj kev kawm yuav tsum tau
Xaiv Qhov Kev Xaiv no
Cov qauv thiab cov khoom siv

Chaw Capsule Structure, Lub hnab ntawv thiab Sab hauv Systems

Lub capsule yog tsim los ua ib chav tsev sib xyaw ua ke. Ncej, plhaub, rwb thaiv tsev, glazing, waterproofing, cov khoom siv hluav taws xob thiab cov khoom siv yuav tsum tau teev tseg ua ke rau lub hom phiaj kev nyab xeeb thiab cov qauv hauv zos.

Kub-Dip Galvanized Steel Ncej

Kub-dip galvanized steel thav duab tsim lub ntsiab load-bearing qauv rau lub Hoobkas sib dhos, tag nrho-tsev lifting thiab tso rau sab nraum zoov.

Aluminium los yog Galvanized Steel Plhaub

Fluorocarbon-coated aluminium ntawv yog lub plhaub tseem ceeb ntawm kev xaiv, nrog galvanized steel ntawv kuj tau teev ua lwm txoj hauv kev.

50-100 hli Insulated hnab ntawv

PU, PIR los yog XPS puas rwb thaiv tsev yog muaj nyob rau hauv ib tug 50-100 hli muaj thickness ntau yam; qhov kawg build-up yuav tsum phim qhov project huab cua.

Ob chav-Insulated LOW-E Glazing

Muab ob npaug rau-insulated tempered LOW-E iav tsim cov panoramic qhov rais system siv rau panoramic qhov rais system.

Water-Resistant Sab hauv Flooring

Marble-zoo li hauv pem teb los yog SPC flooring yog teev nyob rau hauv tiav kev pab cuam interiors, nrog rau qhov kawg tiav xaiv los ntawm pob.

Factory-Integrated Utilities thiab khoom siv

Tej pob khoom muaj xws li 220V hluav taws xob kev pab cuam, PPR dej kav, PVC conduits, cua txias, dej rhaub thiab xaiv ntse tswj. Cov qauv ntawm qhov chaw yuav tsum tau lees paub.

 Seismic qib 7-9, cua qib 10-12, suab rwb thaiv tsev cov nuj nqis tsawg kawg yog 35-55 dB, hluav taws kub tsis kam siab tshaj 4 teev, kev khiav hauj lwm kub ntawm -45 ° C txog 45 ° C thiab 30-50 xyoo kev pab cuam-lub neej ntau yam. Cov txiaj ntsig no xav tau kev txheeb xyuas qhov tshwj xeeb thiab kev tshuaj xyuas hauv zos-code.
Qhov project xaiv xaiv

Sib phim tus qauv loj rau koj qhov project

Siv daim ntawv thov, kev nyob, kev nyab xeeb, pob khoom sab hauv thiab kev xa mus los txheeb xyuas qhov pib loj. Cov cuab yeej no tsis yog kev suav nrog cov qauv lossis logistics.

Tus selector muab qhov kev pom zoo ua ntej loj xwb. Cov qauv kawg, ua tiav qhov hnyav, hluav taws xob thauj khoom, kev txhawb nqa, kev thauj mus los thiab qhov chaw yuav tsum tau ua raws li kev pom zoo.

Kev npaj sab hauv

Npaj sab hauv ib ncig ntawm lub hom phiaj siv

Cov khoom txhawb nqa chav pw, chaw so, chav dej ntiag tug, saib lawj, chav ua noj-bar thiab cov khoom siv ntse xaiv. Qhov tseeb layouts txawv ntawm qhov loj thiab kev txiav txim configuration.

Waterfront space capsule unit
Compact Homestay Room
7,5m uaQhov chaw pw tsaug zog, panoramic glazing thiab chav dej ntiag tug hauv ib lub tsev me me.
Space capsule scenic sab hauv thiab resort chaw
Panoramic Guest Suite
8,5m uaPw tsaug zog cheeb tsam, lounge, qhuav-ntub cais chav dej thiab xaiv cov khoom ntse-tswj.
Space capsule panoramic iav facade
Tsev Neeg / Long-Stay Suite
11,5m ibnthuav lounge, cia, xaiv chav ua noj bar thiab ib tsev neeg-taw qhia kom pw tsaug zog.
Hmo ntuj iav-pem hauv ntej qhov chaw capsule
Café / Reception Capsule
8.5 m los yog 11.5 m unitQhib kev lag luam layout nrog panoramic glazing, ib cheeb tsam tso saib thiab xaiv qhov kev pab cuam counter.
Layouts tsuas yog pib qhov loj me xwb. Qhov rooj, qhov rais, chav dej, chav ua noj-bar thiab rooj tog zaum raug lees paub tom qab xaiv qhov loj me, qauv thiab cov lus qhia yuav tsum tau tshuaj xyuas.
Kev kho kom haum

Configure Materials, Sab hauv Systems thiab Guest Equipment

Kev xaiv cov khoom siv, kev ua haujlwm qhua, ua tiav qhov hnyav, hluav taws xob thauj khoom thiab kev nyab xeeb yuav tsum tau ua haujlwm ua ntej tsim khoom.

Sab nrauv PlhaubSab nrauv tiav thiab tiv thaiv huab cua
  • Fluorocarbon-coated aluminium plhaub
  • Galvanized steel lwm txoj
  • Xim thiab tiav yuav raug lees paub ntau lawm
Rwb thaiv tsev pobRwb thaiv tsev xaiv rau qhov chaw nyab xeeb
  • PU / PIR / XPS pawg thawj coj saib
  • Muaj thickness ntau: 50-100 hli
  • Qhov kawg thermal kev ua tau zoo tau lees paub los ntawm cov khoom tsim tsim
Glazing PobPanoramic views, kev ceev ntiag tug thiab kev tswj cua sov
  • Ob chav insulated LOW-E tempered iav
  • Panoramic qhov rais configuration
  • Cov ntaub thaiv npog thiab kev kho tus kheej
Qhua sab hauv

Factory-Tam sim no Cov Kev Pab Cuam Tshuam

Ib qho kev teeb tsa sib xyaw ua ke ua ke ib chav pw, chav so thiab chav dej ntiag tug, nrog rau cov ncauj lus kom ntxaws haum xaiv rau kev siv.

  • Chav pw, lounge thiab chav dej ntiag tug
  • Qhuav-ntub cais chav dej
  • Vanity, daim iav, chav dej thiab da dej fittings
  • Yeem saib lawj, chav ua noj bar thiab tub yees
Qhov chaw capsule chav pw sab hauv
Ua tiav chav pw thiab lounge
Space capsule layout tswvyim
Sab hauv pob tswvyim
Space capsule panoramic iav facade
Panoramic façade nthuav dav
Cov tshuab ntse

Optional Smart Controls thiab Guest Equipment

Paub meej tias qhov chaw voltage, cov npe khoom siv thiab tswj kev ua haujlwm ua ntej ntau lawm yog li kev thauj khoom, xaim thiab cov khoom siv tuaj yeem sib koom ua ke.

  • Kev tswj hwm lub tsev thiab lub suab tswj kev xaiv
  • Daim npav fais fab, scene hom thiab hluav taws xob curtains
  • Central cua txias, dej rhaub thiab tub yees
  • Yeem loj hluav taws xob skylight
Space capsule tsev crane lifting
Tag nrho-unit lifting thiab positioning
Space capsule forest deck unit
Nruab daim ntawv thov capsule
Chaw ntim tshuaj Hoobkas thiab cov qauv puag ncig
Kev kuaj xyuas lub Hoobkas

Xav tau ib daim ntawv qhia txog qhov loj thiab cov khoom siv?

Xa mus rau qhov chaw, npaj siv, kom muaj nuj nqis, nyiam qhov loj me thiab xav tau chav ua haujlwm. Cov lus hais tuaj yeem cais lub hauv paus chav tsev, pob khoom, lub Hoobkas haum-tawm, khoom siv thiab xa khoom.

Npaj Kuv Cov Lus Nug
Qhov zoo ntawm qhov project

Tswv yim zoo ntawm Factory-Prefabricated Capsule Houses

Cov khoom sib xyaw ua ke tshwj xeeb ntawm cov qhua-ntsej muag nrog lub Hoobkas kev koom ua ke, kev thauj mus los ua tiav thiab txwv kev sib dhos ntawm qhov chaw.

Txo kev ua haujlwm ntawm qhov chaw

Nrog rau qhov chaw thiab kev txhawb nqa npaj ua ntej, kev ua haujlwm ntawm qhov chaw tsom mus rau kev nqa, qhov chaw thiab kev siv hluav taws xob sib txuas.

Tsim Ib Qhov Chaw Zoo Tshaj Plaws

Lub plhaub nkhaus, panoramic glazing thiab configurable sab hauv pab tsim ib tug recognizable tos txais los yog chaw lag luam.

Ua raws li pob khoom huab cua

Rwb thaiv tsev thickness, glazing, HVAC thiab plhaub kev kho mob tuaj yeem raug teev rau qhov project ib puag ncig, raug kev pom zoo.

Npaj thauj ua ntej ntau lawm

Ua tiav-unit qhov ntev ua rau txoj kev tshem tawm, lub peev xwm crane, tshem tawm txoj haujlwm thiab txhawb nqa ib feem ntawm cov khoom txiav txim siab.

Khaws Kev Hloov Chaw Flexibility

Lub module tuaj yeem nqa thiab rov ua haujlwm thaum nkag mus, crane muaj peev xwm, kev txhawb nqa thiab kev tso cai siv hluav taws xob.

Kev sib xyaw kom haum-Out hauv lub Hoobkas

Lub plhaub, glazing, waterproofing, khoom siv hluav taws xob, chav dej thiab cov khoom siv yeem tuaj yeem sib sau ua ke thiab kuaj xyuas ua ntej xa.

Cov khoom thiab qhov project visuals

Khoom duab ntawm sab nrauv, sab hauv thiab qhov chaw teeb tsa

Lub gallery qhia tau hais tias nkhaus sab nrauv plhaub, panoramic glazing, tiav chav qhua, tag nrho chav tsev nqa thiab scenic-site tso.

Lit space capsule park qauv
Resort capsule sab nrauv
Space capsule nrog panoramic lawj
Panoramic pem hauv ntej façade
Space capsule tsev crane lifting
Crane lifting txheej txheem
Qhov chaw capsule chav pw sab hauv
Ua tiav qhua sab hauv
Qhov chaw capsule sab nrauv ntawm qhov chaw roob
Txhim kho kev lag luam / chaw ua si
Hillside space capsule kev pab pawg
Mountain-site capsule visual
Daim ntawv thov

Qhov chaw Capsule Houses tuaj yeem siv tau

Lub tsev capsule yog tsim rau kev tos txais, kev lag luam, chaw ua haujlwm ib ntus thiab kev siv pej xeem. Cov qauv kawg thiab cov tshuab yuav tsum raug xaiv rau qhov chaw tiag tiag thiab kev ua haujlwm yuav tsum tau ua.

Hillside space capsule kev pab pawg

Scenic Resorts thiab Homestays

Lub Hoobkas ua tiav cov qhua tuaj noj mov rau thaj chaw scenic, hav zoov, lakesides, roob thiab lwm yam haujlwm ncig ua si.

Space capsule scenic sab hauv thiab resort chaw

Vacation Rental / Airbnb

Qhov txawv ntawm qhov chaw nyob luv luv rau cov khoom ntiag tug so thiab kev ua haujlwm xauj tsev.

Waterfront space capsule unit

Camping thiab Farm Stay

Relocatable chaw nyob rau camping chaw, ua liaj ua teb nyob thiab tej yaam num tourism.

Hmo ntuj iav-pem hauv ntej qhov chaw capsule

Café thiab Star-Viewing Restaurant

Panoramic chaw lag luam rau cafes, lub hnub qub-saib tsev noj mov, phau ntawv tuav lossis chaw tos txais qhua.

Space capsule resort masterplan

Txais tos, Showroom thiab Pop-Up Chaw

Modular chav rau kev txais tos, cov khoom tso tawm, kev nthuav qhia ib ntus lossis cov khw muag khoom pop-up.

Space capsule forest deck unit

Chaw Ua Haujlwm Ib ntus / Kev Pabcuam Thaum Muaj Xwm Ceev

Hloov chaw rau chaw ua haujlwm ib ntus, chav hais kom ua, teb thaum muaj xwm txheej ceev lossis lwm yam kev pabcuam pej xeem.

Order thiab shipping workflow

Los ntawm Requirement Confirmation to Whole-Unit Placement

Vim hais tias cov tshuaj ntsiav yog thauj raws li ib tug ua tiav module, lub site, nkag mus rau hauv, lifting txoj kev npaj, txhawb cov ntsiab lus thiab cov qauv siv hluav taws xob yuav tsum tau tshuaj xyuas ua ntej cov ntaub ntawv ntau lawm yog khov.

Qhov xav tau ntawm qhov project thiab tshuaj xyuas qhov chaw

Paub meej tias daim ntawv thov, qhov chaw, thaj av, kev nkag mus, cov ntsiab lus txhawb nqa, crane txoj haujlwm thiab cov cai hauv zos.

Loj thiab Layout Confirmation

Xaiv cov qauv qhov ntev, chav ua haujlwm, glazing kev npaj, chav dej, chav ua noj-bar thiab cov khoom siv pob.

Factory Prefabrication thiab Fit-Out

Ua cov steel ncej, plhaub, rwb thaiv tsev, glazing, utilities thiab paub tseeb hais tias sab hauv pob nyob rau hauv lub Hoobkas.

Pre-Delivery Function Check

Tshawb xyuas cov glazing ntsia, cov ntsiab lus tsis muaj dej, cov khoom siv hluav taws xob, cov khoom tiav thiab cov khoom xaj ua ntej xa.

Ua kom tiav-Unit Transport thiab Positioning

Teem caij tsheb thauj mus los, crane nqa, txhawb kev hloov kho thiab lub zog zaum kawg, kev sib txuas ntawm cov dej thiab cov kav dej.

Kev thauj mus los thiab chaw tso chaw

Ua kom tiav-Unit thauj yuav tsum tau lees paub ua ntej ntau lawm

Cov tsev tshuaj ntsiav tshuaj feem ntau yog xa tawm raws li cov qauv ua tiav es tsis yog cov khoom siv tshem tawm. Cov kev txwv thauj mus los yuav tsum tau kuaj xyuas ua ntej qhov kawg qhov ntev thiab cov khoom siv tau lees paub.

Kho kev thauj thiab nqa raws li ib feem ntawm cov khoom specification

Cov lus piav qhia ntawm cov khoom lag luam qhia txog kev thauj mus los ntawm lub tsheb thiab cov crane tso rau ntawm qhov chaw. Qhov hnyav kawg, tag nrho qhov ntev thiab txoj kev tso cai nyob ntawm seb qhov loj me, cov khoom siv thiab cov khoom siv.

  • Saib xyuas txoj kev dav, choj qhov siab thiab txoj kab uas hla
  • Paub meej tias unloading crane muaj peev xwm thiab ua haujlwm vojvoog
  • Npaj qib, engineered txhawb cov ntsiab lus ua ntej tuaj txog
  • Tiv thaiv panoramic iav thiab lub plhaub sab nraud thaum thauj
  • Txuas lub zog, dej thiab cov dej ntws tawm tom qab qhov kawg qhov chaw
Quotation checklist

Paub meej qhov chaw, qhov loj me thiab cov khoom siv ua ntej hais

Lub tsev capsule tau xa tuaj raws li cov qauv ua tiav, yog li kev nkag mus, nqa, cov ntsiab lus txhawb nqa, cov khoom siv sab hauv thiab cov qauv siv hluav taws xob yuav tsum tau tshuaj xyuas ua ke.

01 / SITE ACCESS

Txoj Kev, Crane thiab Kev Txhawb Nqa

Qhia qhov chaw ntawm qhov chaw, kev nkag mus, qhov chaw thauj khoom, txoj haujlwm crane thiab npaj cov txheej txheem kom xa tuaj yeem kuaj xyuas ntxov.

Saib xyuas qhov chaw nyob
02 / LOJ & LAYOUT

Guest Room los yog Commercial Siv

Xaiv qhov loj me thiab paub meej tias chav pw, lounge, chav dej, chav ua noj-bar, saib lawj lossis chaw txais tos.

Xa Chav Ua Haujlwm
03 / Khoom siv

Hwj chim, HVAC thiab Kev Xaiv Ntse

Paub meej tias qhov hluav taws xob, qhov hluav taws xob tus qauv, lub tshuab cua txias, lub tshuab rhaub dej, kab hlau rhuav, teeb pom kev zoo, rooj tog zaum thiab ntse-tswj yuav tsum.

Paub meej cov cuab yeej
FAQ

Chaw Capsule Tsev Khoom thiab Xa Khoom FAQ

Yuav ua li cas yog lub chaw capsule xa?

Nws yog ib txwm thauj raws li ib tug ua tiav module ntawm lub tsheb siab thiab nqa mus rau hauv txoj hauj lwm los ntawm crane. Paub meej tias txoj kev tshem tawm, qhov kawg chav tsev qhov hnyav, nqa cov ntsiab lus thiab lub peev xwm crane ua ntej ntau lawm.

Nws puas xav tau lub hauv paus pob zeb?

Lub hauv paus txheej txheem nyuaj feem ntau tsis tsim nyog; chav tsev tuaj yeem ntsia tau rau ntawm kev npaj txhawb nqa taw thaum lub chaw tsim khoom tso cai. Qhov kev txhawb nqa tiag tiag lossis lub hauv paus tsim yuav tsum tau lees paub rau cov av, struts, loads thiab hauv zos code.

Nws tuaj yeem siv sai npaum li cas tom qab tuaj txog?

Thaum nkag mus, crane, kev txhawb nqa cov ntsiab lus thiab cov khoom siv tau npaj txhij, nqa, qhov chaw thiab kev siv hluav taws xob tuaj yeem ua tiav hauv tsawg li 2-4 teev. Qhov no tsis suav nrog qhov chaw npaj, thauj lossis qhov project commissioning.

Sab hauv tuaj yeem xa tuaj qhua-npaj?

Yog lawm. Ib pob khoom muaj xws li chav pw, chav pw, chav dej, teeb pom kev zoo, HVAC, rooj tog thiab xaiv chav ua noj-bar lossis cov khoom siv ntse tswj. Daim ntawv teev cov khoom muaj tseeb yog kev txiav txim tshwj xeeb.

Nws puas tuaj yeem siv rau thaj chaw txias lossis kub?

Cov khoom tuaj yeem teeb tsa rau thaj chaw kub lossis txias, nrog rau -45 ° C txog 45 ° C kev khiav hauj lwm ntau yam muaj los ntawm kev qhia tshwj xeeb. Thaum kawg rwb thaiv tsev, glazing, HVAC, waterproofing, khoom siv thiab kev cai raws cai yuav tsum tau raws li qhov chaw ntawm huab cua.

Lub tsev puas tuaj yeem hloov chaw tom qab?

Qhov ua tiav module tuaj yeem nqa thiab txav mus los, raug rau txoj kev nkag, crane muaj peev xwm, kev txhawb nqa kev npaj thiab kev nyab xeeb kev cuam tshuam thiab kev sib txuas ntawm cov khoom siv hluav taws xob.

Cov qauv hluav taws xob twg tuaj yeem npaj tau?

Lub tshuab hluav taws xob 220V tuaj yeem npaj tau raws li cov qauv pob. Voltage, zaus, qhov (socket standard), cable sizing thiab txuas cov khoom siv yuav tsum tau lees paub rau qhov chaw ua lag luam.

Qhov ntau thiab tsawg thiab qhov hnyav npaum li cas muaj?

Standard ib-storey qhov ntau thiab tsawg muaj xws li 7.5 × 3.3 × 3.2 m, 8.5 × 3.3 × 3.2 m thiab 11.5 × 3.3 × 3.2 m, nrog thaj tsam ntawm 19, 28 thiab 36.8 sqm. Ua tiav-unit hnyav feem ntau yog 5.8-9 t, nyob ntawm kev teeb tsa.

Cov lus hais txog qhov project

Npaj ib qhov Project-Specific Space Capsule House Inquiry

Siv cov configurator no los npaj cov txheej txheem tseem ceeb ua ntej. Kev xa mus zaum kawg yuav raug xa los ntawm daim ntawv nug ntawm qhov chaw, yog li kev teeb tsa tuaj yeem raug tshuaj xyuas kom ntseeg tau.

  • Destination, site hom, npaj siv thiab nyob
  • Nyiam tus qauv loj lossis thov kom pom zoo
  • Sab hauv kev ua haujlwm, cov qauv hluav taws xob thiab cov khoom siv yuav tsum tau ua
  • Muaj nuj nqis, lub sij hawm, txoj kev nkag mus thiab ib txoj kev tiv thaiv kev sib cuag