
Double Wing 700 Expandable Ile
Isunmọ. 7.5m x 7.5m ifẹsẹtẹ gbooro pẹlu isunmọ. Giga inu 2.8m fun gbigbe iwọn didun nla, alejò ati awọn aye iṣẹ akanṣe.
Beere Awọn alaye AwoṣeAwọn ile gbigbe, ti o le ṣe pọ ti o ṣii lati ẹgbẹ mejeeji lati ṣẹda aaye lilo nla fun ibugbe, irin-ajo, awọn ibudo ikole, awọn iṣẹ pajawiri ati awọn ohun elo iṣowo.
Ile ti o gbooro ni iyẹ-meji jẹ gbigbe, ile iṣọpọ ti o ṣee ṣe pọ. Lẹhin ipo Kireni, awọn iyẹ mejeeji ṣii ati pe o ni ifipamo pẹlu awọn boluti, yiyipada ara sowo iwapọ sinu aaye ti o ṣetan lati baamu pẹlu iṣẹ aaye ti o kere pupọ ju ikole igba diẹ lọ.
Fi Project ibeereTabili ṣe afiwe iwọn iwọn to wa. Iwọn pọ ati opoiye ikojọpọ jẹ timo lẹhin iyaworan ikẹhin ati ero iṣakojọpọ.
| Awoṣe | Ti fẹ Iwon | Giga / Ti abẹnu Giga | Ti ṣe pọ Iwon | Agbegbe Ilẹ | 40HQ ikojọpọ |
|---|---|---|---|---|---|
| Double Wing 700 | Isunmọ. L7500 x W7500 mm | Ti abẹnu isunmọ. 2800 mm; ita isunmọ. 3100 mm | Jẹrisi pẹlu imọ-ẹrọ ikẹhin | Iṣiro ifẹsẹtẹ isunmọ. 56.25 sqm | Jẹrisi pẹlu ik iṣeto ni |
| 20ft Double-Wing House | L5900 x W6300 x H2480 mm | H2480 mm | L5900 x W2200 x H2480 mm | Isunmọ. 37 sqm | 2 ṣeto fun 40HQ |
| 30ft Double-Wing House | L9150 x W6300 x H2480 mm | H2480 mm | L9150 x W2200 x H2480 mm | Isunmọ. 54 sqm | Jẹrisi pẹlu ik iṣeto ni |
| 40ft Double-Wing House | L11800 x W6300 x H2480 mm | H2480 mm | L11800 x W2200 x H2480 mm | Isunmọ. 74 sqm | 1 ṣeto fun 40HQ |
Akiyesi ise agbese: awọn iye gangan ti o wa loke ti pese sile lati sipesifikesonu ọja lọwọlọwọ. Agbegbe ilẹ ilẹ Double Wing 700 jẹ iṣiro ifẹsẹtẹ 7.5m x 7.5m ti o rọrun; Ik nkan elo agbegbe da lori isejade iyaworan.
Awọn mẹrin awọn kaadi tẹle awọn ti isiyi awoṣe ibiti. Awọn fọto ọja jẹ awọn ayẹwo ile-iṣẹ gangan ati ṣe apejuwe agbara ipari; ik tosisile ati irisi tẹle awọn timo iyaworan.

Isunmọ. 7.5m x 7.5m ifẹsẹtẹ gbooro pẹlu isunmọ. Giga inu 2.8m fun gbigbe iwọn didun nla, alejò ati awọn aye iṣẹ akanṣe.

Awoṣe iṣalaye okeere boṣewa fun gbigbe idile, ibugbe oṣiṣẹ, awọn ọfiisi aaye ati awọn ipalemo apọjuwọn to wọpọ.

Aṣayan iwọn aarin fun awọn olura ti o nilo awọn yara diẹ sii ju awoṣe 20ft laisi gbigbe taara si ifẹsẹtẹ 40ft.

Aṣayan akọkọ ti a ṣe akojọ ti o tobi julọ fun ibugbe ọpọlọpọ-yara, irin-ajo, iṣowo ati awọn ipilẹ idile nla.
Iwọn awoṣe lọwọlọwọ n ṣalaye fireemu, ogiri, ṣiṣi, ilẹ-ilẹ ati awọn aṣayan iṣẹ ti ile-iṣẹ ti pari awọn olura yẹ ki o jẹrisi ṣaaju asọye.
Q235 galvanized, irin tabi irin odi tinrin-ogiri ti o tutu ti o ni awọ elekitirotatic ti a bo fun agbara igbekalẹ ati aabo ipata.
Awọn panẹli ounjẹ ipanu EPS, awọn panẹli irun apata ati awọn aṣayan odi idapọmọra ti o dojukọ irin ni a le sọ pato, pẹlu awọn idii iṣẹ ṣiṣe ina Kilasi A.
Gbona-fifọ aluminiomu casement tabi sisun ilẹkun, PVC tabi titanium-magnesium alloy windows, pẹlu ni ilopo-glazed gilasi awọn aṣayan.
Ilẹ-ilẹ SPC tabi ibora ilẹ-igi-igi ti a ti yan fun resistance yiya, mimọ ati awọn ibeere agbegbe tutu.
Paipu omi PPR ti ounjẹ-ounjẹ, conduit itanna ti a ti ṣaju-ọna, awọn iho ati awọn atọkun le ti pese sile ni ile-iṣẹ fun asopọ aaye.
Yara, yara nla, ibi idana ounjẹ ti o ni irisi L, baluwe ti o yapa tutu-gbẹ, ina, fentilesonu ati awọn agbegbe ti o ti ṣetan ohun-ọṣọ le jẹ iṣọpọ.
Yan lilo, ipalemo, ipari ati opoiye. Ọpa naa ṣeduro Double Wing 700, 20ft, 30ft tabi 40ft ati gbe abajade lọ si fọọmu RFQ.
Eleyi selector yoo fun a awoṣe starting point. Ifowoleri ipari tun da lori opin irin ajo, package ohun elo, opoiye ati awọn ibeere iṣẹ akanṣe agbegbe.
Yiyan ti o wọpọ fun gbigbe idile, ọfiisi ati awọn iṣẹ akanṣe ibugbe boṣewa.
Awọn ipilẹ nla fun awọn agọ isinmi, ile ẹgbẹ ati awọn inu ilohunsoke lilo-owo.
Yan sojurigindin facade ati itọsọna awọ fun ọja iṣẹ akanṣe, oju-ọjọ, agbegbe aaye ati yiyan olura agbegbe.
Iṣeto ṣiṣii le ṣe atunṣe fun aabo, fentilesonu, if'oju, itọsọna iwọle ati asopọ iloro.
Ile naa le ti pari ni ile-iṣẹ fun lilo imurasilẹ-lati-ṣopọ, pẹlu awọn ipin yara ati awọn aaye iṣẹ ni ipoidojuko ṣaaju iṣelọpọ.
Awọn yiyan ohun elo ṣe iranlọwọ fun awọn olura lati ṣe afiwe ipele ipari ati awọn iwulo itọju ṣaaju asọye.
Awọn ẹya afikun le jẹ ki ẹyọ ipilẹ jẹ dara julọ fun awọn ibi isinmi, awọn ibudo, gbigba iṣowo ati awọn iṣẹ igbe laaye igba pipẹ.
Sọ fun wa iwọn awoṣe, ero ilẹ, nronu inu, nronu ita, igbimọ ilẹ, ipele ohun ọṣọ, iwọn itanna ati orilẹ-ede ti nlo. A le ṣe atunwo iṣeto naa ki o dahun pẹlu itọsọna itọka asọye diẹ sii.
Lẹhin ipo, awọn iyẹ mejeeji ṣii ati pe o wa ni ifipamo pẹlu awọn boluti, idinku awọn iṣowo tutu ati iṣẹ aaye eka.
Ara 20ft ṣe pọ si iwọn 2200mm ati gbooro si 6300mm; Awọn ẹru 20ft 2 ṣeto fun 40HQ ati awọn ẹru 40ft 1 ṣeto.
Idana, baluwe, paipu omi PPR, awọn ipa-ọna itanna, ilẹ-ilẹ, awọn ilẹkun ati awọn window le ṣee pese ṣaaju ifijiṣẹ.
Pẹlu iṣẹ ṣiṣe to dara ati itọju, eto kika le ṣe atilẹyin to awọn ọna kika kika 500 ati iwọn igbesi aye iṣẹ ọdun 10-30+ kan.
Awọn aṣayan to wa pẹlu lilẹ, idabobo, aabo omi, ọrinrin/idabobo ipata, ina ati awọn idii iṣẹ jigijigi/afẹfẹ.
Eto ile-iṣẹ ti ile-iṣẹ le dinku iṣẹ aaye, iṣakoso ile-igba diẹ ati isọdọkan ni akawe pẹlu awọn solusan ti a ṣe aaye ti aṣa.
Awọn fọto wọnyi ni a lo bi iṣelọpọ ati awọn itọkasi ipari. Exact model size, openings and facade package must follow the approved order drawing.





Awọn yara atunwi fun awọn amayederun, iwakusa ati ibugbe iṣẹ oṣiṣẹ latọna jijin.
Yara afikun aaye gbigbe pẹlu awọn yara iwosun, yara nla, ibi idana ounjẹ ati ifiyapa baluwe.
Awọn facades aṣa, iloro / awọn aṣayan deki ati awọn inu ilohunsoke ti o pari fun yiyalo ati awọn iṣẹ alejò.
Awọn ile itaja kọfi, awọn yara iwẹwẹ, awọn aye gbigba, awọn ọfiisi tita kekere ati awọn yara iṣowo igba diẹ.
Ibugbe imuṣiṣẹ ni iyara, agbegbe iṣẹ ati awọn aaye atilẹyin pajawiri igba diẹ.
Awoṣe, ohun elo ati awọn yiyan ikojọpọ ti iṣeto fun pinpin okeokun ati ipese iṣẹ akanṣe.
Ibeere ti o ni okun sii yẹ ki o tii awoṣe lọwọlọwọ, eto, idabobo, ero yara, boṣewa MEP, package ipari ati opin irin ajo ṣaaju iṣelọpọ.
Jẹrisi orilẹ-ede, afefe, lilo aaye, awọn ireti koodu agbegbe ati ọjọ ifijiṣẹ ibi-afẹde.
Yan Double Wing 700, 20ft, 30ft tabi 40ft ni lilo agbegbe, iga, ikojọpọ ati awọn ibeere yara.
Jẹrisi awọn ipin yara, awọn ṣiṣi, fireemu Q235, idabobo ogiri, ilẹ ilẹ, ibi idana ounjẹ, baluwe ati iwọn itanna.
Ṣe agbejade fireemu, awọn panẹli, pari ati awọn ohun elo imudarapọ, lẹhinna ṣayẹwo eto, awọn iwọn, awọn ṣiṣi ati awọn iṣẹ.
Ṣetan ero ikojọpọ, awọn paati nọmba, awọn aworan, awọn fọto / awọn fidio ati itọsọna asopọ aaye.
Awọn ile faagun iyẹ-meji jẹ atunto gaan. Apejuwe ti o wulo yẹ ki o bẹrẹ lati iwọn ipilẹ, ipilẹ yara, ipari ode ati awọn ibeere opin irin ajo.
Yan Double Wing 700, 20ft, 30ft tabi 40ft, lẹhinna jẹrisi yara iyẹwu, yara nla, baluwe, ibi idana ounjẹ ati awọn ipo ṣiṣi.
Firanṣẹ Floor Eto ainiJẹrisi awọn panẹli odi, sojurigindin ita, ipari ilẹ, awọn ilẹkun igbona-ona, iru window, package baluwe ati iṣeto ni itanna.
Jẹrisi Awọn ohun eloPin orilẹ-ede ti nlo, opoiye, iṣeto ifijiṣẹ, awọn ipo oju-ọjọ ati eyikeyi awọn ibeere agbegbe fun afẹfẹ, jigijigi tabi iṣẹ ina.
Mura AsọsọAwọn awoṣe akọkọ pẹlu Double Wing 700, 20ft, 30ft ati 40ft. Awọn titobi 20ft, 30ft ati 40ft ti o gbooro jẹ 5900 x 6300 x 2480 mm, 9150 x 6300 x 2480 mm ati 11800 x 6300 x 2480 mm.
Lẹhin ipo Kireni, awọn iyẹ mejeeji ṣii ati ni ifipamo pẹlu awọn boluti. Ipilẹ aaye, awọn asopọ ohun elo ati awọn ibeere fifi sori agbegbe yẹ ki o jẹrisi ṣaaju gbigbe.
Awoṣe 20ft nigbagbogbo n gbe awọn eto 2 fun 40HQ, lakoko ti awoṣe 40ft nigbagbogbo n gbe 1 ṣeto fun 40HQ. Ikojọpọ fun Double Wing 700 ati 30ft yẹ ki o jẹrisi lati iṣeto ikẹhin.
Fireemu ti o wa ati awọn aṣayan odi pẹlu Q235 galvanized, irin, irin odi tinrin ti o tutu, awọn panẹli ipanu 50mm/65mm EPS, awọn panẹli irun apata ati awọn ọna odi apapo ti o dojukọ irin.
Bẹẹni. Awọn ipin yara, ibi idana ounjẹ ti o ni apẹrẹ L, baluwe, paipu omi PPR, awọn ipa-ọna itanna, awọn iho, ilẹ ilẹ, awọn ilẹkun ati awọn ferese le jẹ iṣakojọpọ bi package ti pari ile-iṣẹ.
Bẹẹni. Yara-iyẹwu meji-iyẹwu kan, yara-yara mẹta-igbesi-aye kan ati awọn eto miiran le ṣe agbekalẹ. Iyaworan ti o samisi ni a nilo fun 30ft, Double Wing 700 ati awọn ipilẹ ti kii ṣe boṣewa.
Pẹlu iṣẹ ṣiṣe to dara ati itọju, eto kika le ṣe atilẹyin to awọn ọna kika kika 500 ati iwọn igbesi aye iṣẹ ọdun 10-30+ kan. Igbesi aye gidi da lori eto, ipari, afefe, lilo ati itọju.
Awọn idii ti o wa pẹlu Ipele 8 seismic, Ite 12 Typhoon ati awọn aṣayan iṣẹ ṣiṣe ina Kilasi A. Ibamu ipari gbọdọ jẹri si iṣeto ti a fọwọsi, data imọ-ẹrọ ati awọn ofin opin irin ajo.
Firanṣẹ orilẹ-ede, ohun elo, awoṣe, opoiye, ipilẹ, fireemu / package odi, ita, ibi idana ounjẹ / iwọn iwẹ, foliteji, awọn ẹya ẹrọ ati ọjọ ifijiṣẹ ibi-afẹde.
Bẹẹni. Awọn ibeere ibi-afẹde le ṣe atunyẹwo ṣaaju asọye, pẹlu iṣeto ni, ikojọpọ, afẹfẹ, jigijigi, ina ati awọn ibeere itanna fun ọja ti o yan.
Fọọmu kukuru n gba alaye pataki ni akọkọ. Awọn ipari alaye, awọn idii ohun elo ati awọn ẹya ẹrọ le jẹrisi pẹlu ẹgbẹ tita lẹhin atunyẹwo akọkọ.