Awọn ile agunmi aaye ti ile-iṣẹ ti a ti ṣe tẹlẹ fun awọn ibugbe, awọn ibi isinmi ati awọn iṣẹ akanṣe iṣowoAwọn iwọn boṣewa, awọn aṣayan inu, gbigbe gbogbo ẹyọkan ati atilẹyin iṣeto aaye
Prefabricated aaye kapusulu ile

Space Capsule Houses fun Resorts ati Homestays

Awọn yara modular ti aṣa ti ọjọ iwaju ti a ṣe ni ayika fireemu irin galvanized ti o gbona, apoowe idayatọ ati panoramic LOW-E glazing. Awọn sipo le jẹ tunto pẹlu awọn inu ilohunsoke ti pari, baluwe, HVAC ati awọn aṣayan iṣakoso-ọlọgbọn, lẹhinna gbe lọ si aaye bi module pipe.

19/28 / 36.8 sqmStandard nikan-oke ile pakà agbegbe.
O kere bi awọn wakati 2-4Gbigbe, ipo ati asopọ ohun elo nigbati aaye naa ti pese sile ni kikun.
Gbogbo-Unit IfijiṣẹModule prefabricated Factory ti gbe lai dismantling.
Space capsule ode ni oke ojula
Space kapusulu igbo dekini kuroKapusulu aaye pẹlu panoramic dekiniSpace capsule yara inu
7.5 / 8.5 / 11.5mStandard nikan-oke ile gigun
50-100mmAwọn aṣayan idabobo akojọpọ
LOW-E GilasiPanoramic glazing ti o ni idabobo meji
Smart AwIṣakoso ohun, awọn aṣọ-ikele ina ati awọn ipo iṣẹlẹ
Akopọ ọja

Yara apọjuwọn pipe ti a ṣe apẹrẹ fun ibugbe iwoye ati lilo iṣowo.

Ọja naa nlo fireemu irin ti o gbona-fibọ pẹlu aluminiomu tabi ikarahun ita ti galvanized-irin, idabobo akojọpọ ati awọn ṣiṣi didan jakejado. Ti o da lori aṣẹ naa, ile-iṣẹ le ṣepọ awọn ipari inu inu, awọn ohun elo baluwe, omi ati awọn eto itanna, amuletutu, aga ati awọn iṣakoso smati ṣaaju fifiranṣẹ.

Homestay ati asegbeyin ti liloPari-kuro gbigbePanoramic glazingAwọn inu ilohunsoke atunto
Iyatọ alejo iririIta ita ati didan panoramic ṣẹda yara idanimọ fun oju-ilẹ ati awọn iṣẹ alejò.
Ṣetan-atilẹyin fifi soriỌna fifi sori ẹrọ boṣewa nlo fifi sori ẹrọ lori awọn ẹsẹ atilẹyin ti a pese silẹ laisi ipilẹ mora ti eka; awọn atilẹyin ikẹhin gbọdọ baamu aaye ati awọn ipo ile.
Factory-ese fit-jadeIpari inu ilohunsoke, awọn imuduro baluwe, HVAC, omi ati awọn ọna itanna le ṣepọ ṣaaju fifiranṣẹ nigbati o wa ninu aṣẹ.
Gbogbo-kuro sibugbeModule ti o pari ni a le gbe soke ati tunpo nigbati iraye si, agbara Kireni ati gige asopọ ohun elo laaye.
Awọn alaye imọ-ẹrọ pipe

Space Kapusulu House Technical Parameters

ParamitaSipesifikesonu
Mefa ati Electrical Fifuye
Standard Ìwò Mefa7.5 × 3.3 × 3.2 m / 8.5 × 3.3 × 3.2 m / 11.5 × 3.3 × 3.2 m
Agbegbe IlẹIsunmọ. 19 sqm / 28 sqm / 36.8 sqm
Aṣayan itaja-mejiIsunmọ. 80-100 sqm; ise agbese-kan pato mefa ati be
Pari Unit iwuwoIsunmọ. 5.8-9 t; yatọ nipa iwọn ati ki o fi sori ẹrọ iṣeto ni
Ti won won Electrical FifuyeIsunmọ. 11.5 kW
Electrical Fifuye pẹlu Floor AlapapoIsunmọ. 17 kW
Igbekale ati Building apoowe
Ifilelẹ igbekale akọkọGbona-fibọ galvanized, irin fireemu
Ikarahun itaFluorocarbon-ti a bo aluminiomu dì / galvanized, irin dì
Insulation CorePU / PIR / XPS awọn panẹli idabobo akojọpọ
Sisanra idabobo50-100 mm
Gbona ConductivityK <0.45 W/(m²·K)
DidanGilasi otutu LOW-E ti o ni idabobo meji
Pakà IpariIlẹ-ilẹ Marble-wo / ilẹ ilẹ SPC
Aabo omiEto aabo omi Layer mẹfa pẹlu awọn ila lilẹ, ibora ti ko ni omi ati idominugere igbekale
Inu ilohunsoke, IwUlO ati Equipment
Itanna Standard220 V; foliteji nlo ati igbohunsafẹfẹ nilo ìmúdájú
Omi ati Electrical PipesPPR omi pipes / PVC itanna conduits
Wọpọ Inu LayoutYara kan + yara rọgbọkú + baluwe kan; wiwo dekini tabi idana bar iyan
Baluwe PackageIyapa tutu-gbigbẹ, asan, digi, igbonse ati awọn ohun elo iwẹ
HVAC ati Awọn ohun eloCentral air karabosipo, omi ti ngbona ati firiji; iṣeto-ti o gbẹkẹle
Smart-Iṣakoso AwIṣakoso ohun, agbara kaadi, awọn ipo iṣẹlẹ ati awọn aṣọ-ikele ina; itanna skylight iyan
Iṣẹ ṣiṣe
Seismic ResistanceIpele 7-9 aṣayan; jẹrisi nipasẹ imọ-ẹrọ igbekalẹ ikẹhin
Afẹfẹ ResistanceIte 10-12 aṣayan; jẹrisi nipasẹ imọ-ẹrọ igbekalẹ ikẹhin
Ohun idabobo35-55 dB ibiti o
Ina ResistanceAṣayan to wa: ≥4 wakati
Awọn iwọn otutu ti nṣiṣẹ-45 °C to 45 °C ibiti o ṣiṣẹ
Igbesi aye Iṣẹ30-50 ọdun; koko ọrọ si awọn ohun elo, ayika ati itoju
Transport ati fifi sori
Oṣuwọn Prefabrication Factory≥90%
Ọna gbigbeGbogbo-kuro ọkọ irinna lai dismantling
On-Site WorkIpo Kireni, atunṣe atilẹyin ati omi, agbara ati asopọ idominugere
Akoko fifi sori ẹrọBi diẹ bi awọn wakati 2-4 nigbati wiwọle, Kireni, awọn atilẹyin ati awọn ohun elo ti pese sile ni kikun
Atilẹyin / FoundationAtilẹyin-ẹsẹ fifi sori tabi ojula-kan pato ẹlẹrọ support oniru
SibugbepoGbigbe gbogbo ẹyọkan ati iṣipopada ni atilẹyin nigbati ipa ọna ati awọn ipo Kireni gba laaye
Gbogbo awọn isiro jẹ awọn iye igbero ọja fun asọye ati atunyẹwo iṣẹ akanṣe. Jẹrisi awọn iwọn ikẹhin, iwuwo ti o pari, iṣẹ igbekalẹ, fifuye itanna, apẹrẹ atilẹyin ati ibamu koodu agbegbe ni agbasọ ọrọ ati awọn iyaworan ti a fọwọsi.
Awọn atunto ọja

Yan Iwọn Apejuwe Ṣaaju Ijẹrisi Package Inu ilohunsoke

Iwọn, eto glazing, baluwe, igi ibi idana, HVAC, ohun-ọṣọ ati awọn aṣayan iṣakoso smati gbogbo ni ipa iwuwo ti o pari, fifuye itanna ati igbero ifijiṣẹ.

Tan aaye kapusulu o duro si ibikan awoṣe

7,5 m Kapusulu House

Iwọn ile-iyẹwu kan ti o kere ju, ti o baamu si yara ibugbe ile iwapọ, ọfiisi aladani tabi aaye gbigba.

Isunmọ. 19 sqmAgbegbe Ilẹ
7.5 × 3.3 × 3.2 mStandard Iwon
Ile-itaja kanṣoṣoIfilelẹ iwapọGbogbo-kuro ifijiṣẹ
Yan Aṣayan yii
Space kapusulu panoramic gilasi facade

8,5 m Kapusulu House

Aṣayan iwọn-aarin fun suite alejo pẹlu baluwe aladani kan, agbegbe rọgbọkú ati ohun elo smati yiyan.

Isunmọ. 28 sqmAgbegbe Ilẹ
8.5 × 3.3 × 3.2 mStandard Iwon
Alejo suitePanoramic glazingSmart awọn aṣayan
Yan Aṣayan yii
Space capsule ode ni oke ojula

11,5 m Kapusulu House

Iwọn oke-nla kan ti o gunjulo julọ, pẹlu yara diẹ sii fun suite ti o da lori idile, ibi ipamọ tabi awọn iṣẹ iṣowo.

Isunmọ. 36.8 sqmAgbegbe Ilẹ
11.5 × 3.3 × 3.2 mStandard Iwon
tobi suiteIfilelẹ idileIdana-bar aṣayan
Yan Aṣayan yii
Oke aaye agunmi stilt iṣupọ

Ile Kapusulu Ile-itaja Meji (Aṣa)

Iṣeto ni ipele meji-iṣẹ akanṣe kan fun awọn suites idile tabi ibugbe ẹgbẹ, to nilo igbekalẹ igbẹhin, atilẹyin ati imọ-ẹrọ gbigbe.

Isunmọ. 80-100 sqmAgbegbe ngbero
Ise agbese-patoIpo Imọ-ẹrọ
Ile oloke mejiIlana aṣaIwadi ipa ọna ti a beere
Yan Aṣayan yii
Ilana ati awọn ohun elo

Aaye Kapusulu Be, apoowe ati inu ilohunsoke Systems

Awọn kapusulu ti wa ni itumọ ti bi ohun ese apọjuwọn yara. Férémù, ikarahun, idabobo, glazing, waterproofing, awọn ohun elo ati ẹrọ gbọdọ wa ni pato papọ fun oju-ọjọ ti nlo ati awọn iṣedede agbegbe.

Gbona-Dip Galvanized Irin fireemu

Irin ti o gbona-dip galvanized, irin fireemu fọọmu akọkọ fifuye-ara be fun factory ijọ, gbogbo-kuro gbigbe ati ita gbangba placement.

Aluminiomu tabi Galvanized Irin ikarahun

Iwe alumọni Fluorocarbon ti a bo ni aṣayan ikarahun akọkọ akọkọ, pẹlu dì irin galvanized tun ṣe akojọ bi yiyan.

50-100 mm apoowe idabobo

PU, PIR tabi XPS idabobo apapo wa ni iwọn 50-100 mm ti o wa ni sisanra; Ik Kọ-soke yẹ ki o baramu afefe ise agbese.

Gilasi Ilọpo-meji LOW-E

Gilasi LOW-E ti o ni idabobo meji ṣe agbekalẹ eto window panoramic ti a lo fun eto window panoramic.

Omi-sooro inu ilohunsoke Flooring

Ilẹ-ilẹ Marble tabi ilẹ ilẹ SPC ti wa ni atokọ fun awọn inu ilohunsoke ibugbe ti o pari, pẹlu ipari ipari ti a yan nipasẹ package.

Awọn ohun elo Isepọ ti Ile-iṣẹ ati Awọn ohun elo

Awọn idii ti o wọpọ pẹlu iṣẹ itanna 220V, awọn paipu omi PPR, awọn conduits PVC, air conditioning, igbona omi ati awọn iṣakoso ijafafa yiyan. Awọn ajohunše opin si gbọdọ wa ni timo.

 Awọn ipele seismic 7-9, awọn ipele afẹfẹ 10-12, awọn nọmba idabobo ohun ti o kere ju 35-55 dB, resistance ina loke awọn wakati 4, iwọn otutu iṣẹ-ṣiṣe ti -45°C si 45°C ati iwọn iṣẹ-aye ọdun 30-50. Awọn iye wọnyi nilo ijẹrisi imọ-ẹrọ pato-iṣẹ akanṣe ati atunyẹwo koodu agbegbe.
Ayanfẹ igbogun ise agbese

Baramu a Standard Iwon to Your Project

Lo ohun elo, ibugbe, oju-ọjọ, package inu ati iraye si ifijiṣẹ lati ṣe idanimọ iwọn ibẹrẹ kan. Ọpa yii kii ṣe iṣiro igbekale tabi eekaderi.

Oluyan naa pese iṣeduro iwọn alakoko nikan. Eto ipari, iwuwo ti o pari, fifuye itanna, awọn atilẹyin, gbigbe ati awọn ibeere aaye wa koko ọrọ si ìmúdájú.

Inu ilohunsoke igbogun

Gbero inu ilohunsoke ni ayika lilo ti a pinnu

Ọja naa ṣe atilẹyin yara, rọgbọkú, baluwe aladani, deki wiwo, ibi idana ounjẹ ati awọn aṣayan ohun elo ọlọgbọn. Awọn ipalemo gidi yatọ nipasẹ iwọn ati iṣeto ni aṣẹ.

Waterfront aaye kapusulu kuro
Iwapọ Homestay Room
7,5 m kuroAgbegbe sisun, glazing panoramic ati baluwe ikọkọ ni iwọn ile-ẹyọkan ti o kere julọ.
Space capsule iho-inu ilohunsoke ati asegbeyin ti eto
Panoramic Guest Suite
8,5 m kuroAgbegbe sisun, yara rọgbọkú, baluwe ti o yapa tutu-gbẹ ati ohun elo iṣakoso ijafafa aṣayan.
Space kapusulu panoramic gilasi facade
ebi / Long-Stay Suite
11,5 m kuroIrọgbọkú ti o gbooro, ibi ipamọ, ọpa ibi idana yiyan ati eto sisun ti idile.
Alẹ gilasi-iwaju aaye kapusulu
Kafe / gbigba Kapusulu
8,5 m tabi 11,5 m kuroṢii ifilelẹ iṣowo pẹlu didan panoramic, agbegbe ifihan ati counter iṣẹ iyan.
Awọn ipilẹ ti bẹrẹ awọn iwọn nikan. Ilẹkun, window, baluwe, ibi idana ounjẹ ati awọn ipo ohun-ọṣọ ti jẹrisi lẹhin iwọn ti o yan, eto ati awọn ibeere irin-ajo ti ṣe atunyẹwo.
Isọdi

Tunto Awọn ohun elo, Awọn ọna inu inu ati Ohun elo alejo

Aṣayan ohun elo, awọn iṣẹ alejo, iwuwo ti o pari, fifuye itanna ati awọn ibeere oju-ọjọ gbọdọ wa ni ipoidojuko ṣaaju iṣelọpọ.

Ikarahun itaIpari ita ati aabo oju ojo
  • Fluorocarbon-ti a bo aluminiomu ikarahun
  • Galvanized, irin yiyan
  • Awọ ati ipari koko ọrọ si ìmúdájú gbóògì
Idabobo PackageIdabobo ti a ti yan fun afefe nlo
  • PU / PIR / XPS igbimọ akojọpọ
  • Iwọn sisanra ti o wa: 50-100 mm
  • Iṣẹ ṣiṣe igbona ikẹhin ti jẹrisi nipasẹ kikọ ohun elo
Package glazingAwọn iwo panoramic, asiri ati iṣakoso ooru
  • Gilasi otutu LOW-E ti o ni idabobo meji
  • Panoramic window iṣeto ni
  • Awọn aṣọ-ikele ati itọju ikọkọ
Alejo inu ilohunsoke

Package Ibugbe ti Ile-iṣẹ ti pari

Iṣeto ti o wọpọ darapọ yara kan, rọgbọkú ati baluwe aladani kan, pẹlu ibamu alaye ti a yan fun lilo ti a pinnu.

  • Yara, rọgbọkú ati ni ikọkọ baluwe
  • Baluwẹ ti o ya sọtọ-gbẹ
  • Asan, digi, igbonse ati awọn ohun elo iwẹ
  • Deki wiwo yiyan, igi ibi idana ounjẹ ati firiji
Space capsule yara inu
Pari yara ati rọgbọkú
Agbekale kapusulu aaye Erongba
Inu package Erongba
Space kapusulu panoramic gilasi facade
Panoramic facade alaye
Smart awọn ọna šiše

Iyan Smart idari ati alejo Equipment

Jẹrisi foliteji opin irin ajo, atokọ ohun elo ati awọn iṣẹ iṣakoso ṣaaju iṣelọpọ nitorinaa awọn ẹru, onirin ati awọn ipo ohun elo le jẹ ipoidojuko.

  • Iṣakoso gbogbo ile ati aṣayan iṣakoso ohun
  • Agbara kaadi, awọn ipo iṣẹlẹ ati awọn aṣọ-ikele ina
  • Central air karabosipo, omi ti ngbona ati firiji
  • Iyan nla ina skylight
Space kapusulu ile Kireni gbígbé
Gbigbe gbogbo-kuro ati ipo
Space kapusulu igbo dekini kuro
Ohun elo capsule ti a fi sori ẹrọ
Space kapusulu factory ati yika awoṣe
Atilẹyin ayewo ile-iṣẹ

Ṣe o nilo iwọn ti a fọwọsi ati iṣeto ẹrọ?

Firanṣẹ opin irin ajo, lilo ipinnu, opoiye, iwọn ti o fẹ ati awọn iṣẹ yara ti o nilo. Asọsọ le ya sọtọ ipilẹ, package ohun elo, adaṣe ile-iṣẹ, ohun elo ati ipari ifijiṣẹ.

Mura Mi Ìbéèrè
Awọn anfani ise agbese

Awọn Anfani Wulo ti Awọn Ile Kapusulu Ti A Tiṣatunṣe Ile-iṣẹ

Ọja naa ṣajọpọ irisi ti nkọju si alejo ti o yatọ pẹlu iṣọpọ ile-iṣẹ, gbigbe ẹyọkan-pipe ati apejọ ti o ni opin lori aaye.

Din On-Aye Work

Pẹlu aaye ati awọn atilẹyin ti a pese silẹ ni ilosiwaju, iṣẹ lori aaye ni idojukọ ni pataki lori gbigbe, ipo ati asopọ ohun elo.

Ṣẹda Aaye alejo Iyatọ

Ikarahun te, panoramic glazing ati inu ilohunsoke atunto ṣe iranlọwọ ṣẹda alejò ti o ṣe idanimọ tabi aaye iṣowo.

Baramu Package Afefe

Idabobo sisanra, glazing, HVAC ati ikarahun itọju le ti wa ni pato fun awọn ayika ise agbese, koko ọrọ si imọ ìmúdájú.

Gbero Gbigbe Ṣaaju iṣelọpọ

Awọn iwọn-pipe-pipe ṣe imukuro ipa-ọna, agbara Kireni, ipo ikojọpọ ati atilẹyin apakan ti ipinnu ọja.

Daduro Irọrun Sibugbepo

Module naa le gbe soke ati tunpo nigbati wiwọle, agbara Kireni, awọn atilẹyin ati awọn ohun elo laaye.

Ṣepọ Fit-Jade ni Factory

Ikarahun, glazing, waterproofing, awọn ohun elo, baluwe ati ohun elo aṣayan le ṣe apejọ ati ṣayẹwo ṣaaju fifiranṣẹ.

Ọja ati ise agbese visuals

Awọn fọto ọja ti ita, Awọn inu ati fifi sori aaye

Yaraifihan aworan fihan awọn ikarahun ita ti o tẹ, didan panoramic, awọn yara alejo ti o pari, gbigbe gbogbo ẹyọkan ati gbigbe si oju-aye.

Tan aaye kapusulu o duro si ibikan awoṣe
Asegbeyin ti agunmi ode
Kapusulu aaye pẹlu panoramic dekini
Panoramic iwaju facade
Space kapusulu ile Kireni gbígbé
Crane gbígbé ilana
Space capsule yara inu
Pari inu ilohunsoke alejo
Space capsule ode ni oke ojula
Ti fi sori ẹrọ owo / risoti kuro
Hillside aaye capsule iṣupọ
Mountain-ojula kapusulu visual
Awọn ohun elo

Ibi ti Space Capsule Ile Le ṣee lo

Awọn ile capsule aaye jẹ o dara fun alejò, iṣowo, ọfiisi igba diẹ ati awọn lilo iṣẹ gbogbogbo. Ilana ikẹhin ati awọn eto yẹ ki o yan fun aaye gangan ati ibeere iṣẹ.

Hillside aaye capsule iṣupọ

Iwoye Resorts ati Homestays

Ibugbe alejo ti ile-iṣẹ ti pari fun awọn agbegbe iwoye, awọn igbo, awọn adagun adagun, awọn oke-nla ati awọn iṣẹ akanṣe irin-ajo miiran.

Space capsule iho-inu ilohunsoke ati asegbeyin ti eto

Yiyalo isinmi / Airbnb

Iyato ibugbe kukuru-duro fun ikọkọ isinmi-ini ati yiyalo mosi.

Waterfront aaye kapusulu kuro

Ipago ati oko Duro

Ibugbe gbigbe fun awọn aaye ibudó, awọn iduro oko ati awọn iṣẹ akanṣe irin-ajo ti o da lori iseda.

Alẹ gilasi-iwaju aaye kapusulu

Kafe ati Star-Wiwo Restaurant

Aaye iṣowo panoramic fun awọn kafe, awọn ile ounjẹ wiwo irawọ, awọn ifi iwe tabi awọn rọgbọkú alejò.

Space kapusulu ohun asegbeyin ti masterplan

Gbigbawọle, Yaraifihan ati Aye Agbejade

Yara apọjuwọn fun gbigba, ifihan ọja, awọn ifihan igba diẹ tabi soobu agbejade.

Space kapusulu igbo dekini kuro

Ọfiisi igba diẹ / Atilẹyin pajawiri

Aaye ti o tun gbe fun awọn ọfiisi igba diẹ, awọn yara aṣẹ, idahun pajawiri tabi awọn lilo iṣẹ-iranṣẹ miiran.

Ibere ati ifijiṣẹ bisesenlo

Lati Imudaniloju Ibeere si Gbigbe Gbogbo-Ẹyọkan

Nitoripe a gbe kapusulu naa bi module pipe, aaye naa, ipa-ọna iwọle, ero gbigbe, awọn aaye atilẹyin ati boṣewa ohun elo yẹ ki o ṣe atunyẹwo ṣaaju awọn alaye iṣelọpọ ti di didi.

Project ibeere ati Aye Review

Jẹrisi ohun elo, opin irin ajo, ilẹ, opopona wiwọle, awọn aaye atilẹyin, ipo Kireni ati awọn ibeere agbegbe.

Iwọn ati Ìmúdájú Ìfilélẹ

Yan awọn iwọn boṣewa, awọn iṣẹ yara, eto glazing, baluwe, ibi idana ounjẹ ati package ohun elo.

Prefabrication Factory ati Fit-Jade

Ṣe agbejade fireemu irin, ikarahun, idabobo, glazing, awọn ohun elo ati idii inu ilohunsoke ti a fọwọsi ni ile-iṣẹ naa.

Ṣayẹwo Iṣẹ Ifijiṣẹ-tẹlẹ

Ṣayẹwo glazing ti a fi sori ẹrọ, awọn alaye aabo omi, awọn ohun elo, pari ati ohun elo ti a paṣẹ ṣaaju fifiranṣẹ.

Pari-Unit Transport ati ipo

Ṣeto gbigbe ọkọ ayọkẹlẹ igbẹhin, gbigbe Kireni, atunṣe atilẹyin ati agbara ikẹhin, omi ati asopọ idominugere.

Transport ati ojula placement

Gbigbe-pipe-pipe Gbọdọ Jẹrisi Ṣaaju iṣelọpọ

Awọn ile capsule aaye ni a firanṣẹ ni deede bi awọn modulu ti o pari ju awọn ohun elo tuka. Nitorinaa, awọn opin gbigbe gbọdọ ṣayẹwo ṣaaju awọn iwọn ikẹhin ati package ohun elo ti jẹrisi.

Ṣe itọju gbigbe ati gbigbe bi apakan ti sipesifikesonu ọja

Apejuwe ọja naa ṣe alaye gbigbe ọkọ ayọkẹlẹ paati-pipe ati gbigbe Kireni ni opin irin ajo naa. Iwọn ipari, awọn iwọn gbogbogbo ati awọn igbanilaaye ipa-ọna da lori iwọn ti o yan, awọn ohun elo ati ohun elo ti a fi sori ẹrọ.

  • Atunwo iwọn opopona, giga afara ati rediosi titan
  • Jẹrisi agbara ikojọpọ Kireni ati rediosi iṣẹ
  • Mura ipele, awọn aaye atilẹyin ti iṣelọpọ ṣaaju dide
  • Dabobo gilasi panoramic ati ikarahun ita lakoko gbigbe
  • So agbara pọ, omi ati idominugere lẹhin ipo ikẹhin
Atokọ asọye

Jẹrisi Aye, Iwọn ati Ohun elo Ṣaaju Ọrọ sisọ

Awọn ile capsule aaye ti wa ni jiṣẹ bi awọn modulu pipe, nitorinaa iraye si, gbigbe, awọn aaye atilẹyin, ohun elo inu ati awọn iṣedede iwulo yẹ ki o ṣe atunyẹwo papọ.

01 / Wiwọle SITE

Road, Kireni ati Support Awọn ipo

Pin ipo aaye naa, opopona iwọle, agbegbe ikojọpọ, ipo Kireni ati ọna atilẹyin ti a pese silẹ ki a le ṣayẹwo iṣeeṣe ifijiṣẹ ni kutukutu.

Atunwo Awọn ipo Aye
02 / Iwon & Ìfilélẹ

Alejo Yara tabi Commercial Lo

Yan iwọn ti o fẹ ki o jẹrisi yara, rọgbọkú, baluwe, ibi idana ounjẹ, deki wiwo tabi awọn iṣẹ gbigba.

Firanṣẹ Awọn iṣẹ yara
03 / ẸRỌ

Agbara, HVAC ati Awọn aṣayan Smart

Jẹrisi foliteji, boṣewa iho, air conditioning, igbona omi, awọn aṣọ-ikele, ina, aga ati awọn ibeere iṣakoso-ọlọgbọn.

Jẹrisi Ohun elo
FAQ

Space Kapusulu House Ọja ati Ifijiṣẹ FAQ

Bawo ni capsule aaye kan ṣe jiṣẹ?

O ti gbe ni deede bi module ti o ti pari lori ọkọ ayọkẹlẹ ti a ti sọtọ ati gbe soke si ipo nipasẹ Kireni. Jẹrisi kiliaransi ipa-ọna, iwuwo apakan ikẹhin, awọn aaye gbigbe ati agbara Kireni ṣaaju iṣelọpọ.

Ṣe o nilo ipilẹ ti o nipọn?

A eka mora ipile ni igba kobojumu; kuro le ti wa ni fi sori ẹrọ lori gbaradi atilẹyin ẹsẹ nigbati awọn ojula oniru faye gba. Atilẹyin gangan tabi apẹrẹ ipilẹ gbọdọ tun jẹrisi fun ile, ilẹ, awọn ẹru ati koodu agbegbe.

Bawo ni yarayara ṣe le ṣee lo lẹhin dide?

Nigbati wiwọle, Kireni, awọn aaye atilẹyin ati awọn ohun elo ti ṣetan, gbigbe, ipo ati asopọ ohun elo le pari ni diẹ bi awọn wakati 2-4. Eyi ko pẹlu igbaradi aaye, gbigbe tabi fifiṣẹ iṣẹ akanṣe.

Le inu ilohunsoke wa ni jišẹ alejo-setan?

Bẹẹni. Apopọ ti o wọpọ le pẹlu yara kan, rọgbọkú, awọn ohun elo baluwe, ina, HVAC, aga ati ibi idana ounjẹ yiyan tabi ohun elo iṣakoso ọlọgbọn. Atokọ ipese gangan jẹ aṣẹ-pato.

Ṣe o le ṣee lo ni awọn agbegbe tutu tabi gbona?

Ọja naa le tunto fun awọn agbegbe ti o gbona tabi tutu, pẹlu iwọn iṣẹ ṣiṣe -45°C si 45°C ti o wa nipasẹ sipesifikesonu. Idabobo ipari, glazing, HVAC, aabo omi, ohun elo ati ibamu koodu yẹ ki o baamu oju-ọjọ opin irin ajo naa.

Njẹ ẹyọ naa le tun wa sipo nigbamii?

Awọn pipe module le ti wa ni gbe ati ki o gbe, koko ọrọ si ipa ọna, Kireni agbara, support igbaradi ati ailewu gige ati isọdọtun ti igbesi.

Ohun ti itanna bošewa le wa ni pese sile?

Eto itanna 220V le ti pese sile bi idii idiwọn. Foliteji, igbohunsafẹfẹ, boṣewa iho, iwọn okun ati ohun elo ti a ti sopọ gbọdọ jẹ timo fun ọja ti nlo.

Awọn iwọn ati awọn iwọn iwuwo wo ni o wa?

Awọn iwọn ile-itaja kan boṣewa pẹlu 7.5 × 3.3 × 3.2 m, 8.5 × 3.3 × 3.2 m ati 11.5 × 3.3 × 3.2 m, pẹlu awọn agbegbe isunmọ ti 19, 28 ati 36.8 sqm. Pari-kuro iwuwo ni gbogbo nipa 5.8-9 t, da lori iṣeto ni.

Isọ ọrọ-iṣẹ kan pato

Ṣetan Ibeere Ile Kapusulu Kan ti Iṣẹ-Iṣẹ-Pato

Lo atunto yii lati ṣeto awọn ipo iṣẹ akanṣe pataki ni akọkọ. Ifisilẹ ipari ni yoo firanṣẹ nipasẹ fọọmu ibeere aaye, nitorinaa iṣeto le ṣe atunyẹwo ni igbẹkẹle.

  • Ibi ibi-afẹde, iru aaye, lilo ti a pinnu ati ibugbe
  • Iwọn boṣewa ti o fẹ tabi ibeere fun iṣeduro kan
  • Awọn iṣẹ inu inu, boṣewa itanna ati ohun elo ti a beere
  • Opoiye, iṣeto, iraye si ipa ọna ati ọna olubasọrọ igbẹkẹle kan