
Case
Expandable spaces for different ways of living and working.
Client Cases
Explore three customer applications for expandable container houses, from a private backyard residence to remote operations accommodation and a countryside rental project.

Tag: Australia · Residential
Project: Perth Backyard Expandable Granny Flat
✅ Location: Perth, Western Australia
✅ Quantity: 1 unit · 20ft Double Expandable Container House
✅ Delivery: 28 days by sea
✅ Application: Private residential, granny flat
Client Feedback “Delivered on time, easier to assemble than expected. Solid structure, good insulation. Cost 50% less than local building. Very satisfied.”
—— Private Owner, Perth

Tag: USA · Wind Energy Base
Project: Texas Wind Farm On-site Operation Project
✅ Location: Amarillo, Texas
✅ Quantity: 6 units · 40ft Expandable Container House with Porch
✅ Delivery: 30 days by sea, 10 days on-site assembly
✅ Application: On-site O&M staff dormitory, temporary duty office
Client Feedback “The wind farm is remote, and local temporary construction is overpriced with long lead times. The living experience of this expandable house exceeded expectations. The built-in porch is perfect for outdoor breaks, and the thermal insulation fully adapts to Texas summer heat. Overall cost is 35% lower than local solutions, and delivery is twice as fast. We will reorder the same model for our new stations.”
—— Station Manager, New Energy Operation Company


Tag: Spain · Countryside Vacation Rental
Project: Andalusia Countryside Homestay Project
✅ Location: Granada, Andalusia
✅ Quantity: 4 units · 30ft Expandable Container House with Large Terrace
✅ Delivery: 28 days by sea, 8 days on-site assembly
✅ Application: Short-term vacation rental, guest reception
Client Feedback “Local building approval plus construction took over half a year, and we would have missed the peak tourist season. This expandable house has a refined appearance, and the large terrace is very popular with guests. Thermal and sound insulation meet local residential standards. Overall cost is 40% lower than local building, and we successfully opened before the summer peak. We will reorder for future expansion.”
—— Operation Manager, Countryside Homestay Brand
