
Double Wing 700 Expandable House
Approx. 7.5m x 7.5m expanded footprint with approx. 2.8m internal height for larger-volume living, hospitality and project spaces.
Request Model DetailsMovable, foldable modular houses that open from both sides to create larger usable space for accommodation, tourism, construction camps, emergency projects and commercial applications.
The double-wing expandable house is a movable, foldable integrated building. After crane positioning, both wings open and are secured with bolts, converting the compact shipping body into a wider ready-to-fit space with much less site work than conventional temporary construction.
Send Project RequirementsThe table compares the available size range. Folded size and loading quantity are confirmed after the final drawing and packing plan are reviewed.
| Model | Expanded Size | Height / Internal Height | Folded Size | Floor Area | 40HQ Loading |
|---|---|---|---|---|---|
| Double Wing 700 | Approx. L7500 x W7500 mm | Internal approx. 2800 mm; external approx. 3100 mm | Confirm with final engineering | Calculated footprint approx. 56.25 sqm | Confirm with final configuration |
| 20ft Double-Wing House | L5900 x W6300 x H2480 mm | H2480 mm | L5900 x W2200 x H2480 mm | Approx. 37 sqm | 2 sets per 40HQ |
| 30ft Double-Wing House | L9150 x W6300 x H2480 mm | H2480 mm | L9150 x W2200 x H2480 mm | Approx. 54 sqm | Confirm with final configuration |
| 40ft Double-Wing House | L11800 x W6300 x H2480 mm | H2480 mm | L11800 x W2200 x H2480 mm | Approx. 74 sqm | 1 set per 40HQ |
Project note: exact values above are prepared from the current product specification. The Double Wing 700 floor area is a simple 7.5m x 7.5m footprint calculation; final usable area depends on the production drawing.
The four cards follow the current model range. Product photos are actual factory samples and illustrate finish capability; final openings and appearance follow the confirmed drawing.

Approx. 7.5m x 7.5m expanded footprint with approx. 2.8m internal height for larger-volume living, hospitality and project spaces.

The standard export-oriented model for family living, worker accommodation, site offices and common modular layouts.

A middle-size option for buyers who need more rooms than the 20ft model without moving directly to the 40ft footprint.

The largest listed mainstream option for multi-room accommodation, tourism, commercial and larger family layouts.
The current model range defines the frame, wall, opening, flooring and factory-finished service options buyers should confirm before quotation.
Q235 galvanized steel or cold-formed thin-wall steel with electrostatic powder coating for structural strength and corrosion protection.
EPS sandwich panels, rock wool panels and metal-faced composite wall options can be specified, including Class A fire-performance packages.
Thermal-break aluminum casement or sliding doors, PVC or titanium-magnesium alloy windows, with double-glazed tempered glass options.
SPC flooring or wood-grain floor covering selected for wear resistance, cleaning and wet-area requirements.
Food-grade PPR water pipe, pre-routed electrical conduit, sockets and interfaces can be prepared in the factory for site connection.
Bedroom, living room, L-shaped kitchen, dry-wet separated bathroom, lighting, ventilation and furniture-ready zones can be coordinated.
Select use, layout, finish and quantity. The tool recommends Double Wing 700, 20ft, 30ft or 40ft and transfers the result into the RFQ form.
This selector gives a model starting point. Final pricing still depends on destination, material package, quantity and local project requirements.
Common choice for family living, office and standard accommodation projects.
Larger layouts for vacation cabins, team housing and commercial-use interiors.
Choose facade texture and color direction for the project market, climate, site environment and local buyer preference.
Opening configuration can be adjusted for security, ventilation, daylight, access direction and porch connection.
The house can be factory-finished for ready-to-connect use, with room divisions and service points coordinated before production.
Material selections help buyers compare finish level and maintenance needs before quotation.
Add-on structures can make the base unit more suitable for resorts, camps, commercial reception and long-term living projects.
Tell us the model size, floor plan, inner panel, outer panel, floor board, decoration level, electrical scope and destination country. We can review the configuration and reply with a clearer quotation direction.
After positioning, both wings open and are secured with bolts, reducing wet trades and complex site work.
The 20ft body folds to 2200mm width and expands to 6300mm; 20ft loads 2 sets per 40HQ and 40ft loads 1 set.
Kitchen, bathroom, PPR water pipe, electrical routes, flooring, doors and windows can be prepared before delivery.
With proper operation and maintenance, the folding system can support up to 500 folding cycles and a 10-30+ year service-life range.
Available options include sealing, insulation, waterproofing, moisture/corrosion protection, fire and seismic/wind performance packages.
The factory-built system can reduce site labor, temporary-building management and coordination compared with conventional site-built solutions.
These photos are used as manufacturing and finish references. Exact model size, openings and facade package must follow the approved order drawing.





Repeatable rooms for infrastructure, mining and remote-site workforce accommodation.
Fast additional living space with bedrooms, living room, kitchen and bathroom zoning.
Custom facades, porch/deck options and finished interiors for rental and hospitality projects.
Coffee shops, sauna rooms, reception spaces, small sales offices and temporary commercial rooms.
Rapid-deployment shelter, service-area and temporary emergency support spaces.
Model, material and loading choices structured for overseas distribution and project supply.
A stronger inquiry should lock the current model, structure, insulation, room plan, MEP standard, finish package and destination before production.
Confirm country, climate, site use, local code expectations and target delivery date.
Choose Double Wing 700, 20ft, 30ft or 40ft using area, height, loading and room requirements.
Confirm room divisions, openings, Q235 frame, wall insulation, flooring, kitchen, bathroom and electrical scope.
Produce frame, panels, finishes and integrated utilities, then inspect structure, dimensions, openings and services.
Prepare loading plan, numbered components, drawings, photos/videos and site connection guidance.
Double-wing expandable houses are highly configurable. A practical quote should start from the base size, room layout, exterior finish and destination requirements.
Choose Double Wing 700, 20ft, 30ft or 40ft, then confirm bedroom, living room, bathroom, kitchen and opening positions.
Send Floor Plan NeedsConfirm wall panels, exterior texture, floor finish, thermal-break doors, window type, bathroom package and electrical configuration.
Confirm MaterialsShare the destination country, quantity, delivery schedule, climate conditions and any local requirements for wind, seismic or fire performance.
Prepare QuotationMainstream models include Double Wing 700, 20ft, 30ft and 40ft. The 20ft, 30ft and 40ft expanded sizes are 5900 x 6300 x 2480 mm, 9150 x 6300 x 2480 mm and 11800 x 6300 x 2480 mm.
After crane positioning, both wings are opened and secured with bolts. Site foundation, utility connections and local installation requirements should be confirmed before shipment.
A 20ft model usually loads 2 sets per 40HQ, while the 40ft model usually loads 1 set per 40HQ. Loading for Double Wing 700 and 30ft should be confirmed from the final configuration.
Available frame and wall options include Q235 galvanized steel, cold-formed thin-wall steel, 50mm/65mm EPS sandwich panels, rock wool panels and metal-faced composite wall systems.
Yes. Room partitions, L-shaped kitchen, bathroom, PPR water pipe, electrical routes, sockets, flooring, doors and windows can be coordinated as a factory-finished package.
Yes. Two-bedroom-one-living, three-bedroom-one-living and other arrangements can be developed. A marked drawing is required for 30ft, Double Wing 700 and non-standard layouts.
With proper operation and maintenance, the folding system can support up to 500 folding cycles and a 10-30+ year service-life range. Actual life depends on structure, finish, climate, use and maintenance.
Available packages include Grade 8 seismic, Grade 12 typhoon and Class A fire-performance options. Final compliance must be verified against the approved configuration, engineering data and destination rules.
Send country, application, model, quantity, layout, frame/wall package, exterior, kitchen/bathroom scope, voltage, accessories and target delivery date.
Yes. Destination requirements can be reviewed before quotation, including configuration, loading, wind, seismic, fire and electrical requirements for the selected market.
The shorter form collects the essential information first. Detailed finishes, material packages and accessories can be confirmed with the sales team after the initial review.