Home/Products
Modular Building Solutions

Modular House & Prefabricated Container Building Solutions

Explore expandable container houses, folding container houses, quick assembly buildings, space capsule houses and container integrated houses for worker accommodation, site offices, tourism projects, commercial spaces and emergency facilities.

Discuss Your Project
Modular container housing solutions
Our Product Range

Flexible modular spaces, built around transport, installation and project use.

LUMOND modular housing products cover fold-out expandable houses, folding prefabricated houses, quick assembly steel-frame units, panoramic space capsule houses and container integrated building systems. Each product type is planned for a different balance of shipping efficiency, installation speed, reusable project value, interior completion and site access.

Select a product category below to compare typical applications, material options, room layout direction, delivery method and quotation requirements before choosing the detailed product page.

Product Categories

Find the Right Modular Housing Type for Your Site

Compare the main modular building categories by space size, folding method, loading efficiency, interior package, installation method and long-term project use.

Expandable container house

Double-Wing Expandable Houses

Double-wing expandable container houses open from a compact transport form into a larger living or working space. They are suitable for family accommodation, worker housing, resort rooms, site offices and project layouts that need more usable floor area after delivery.

Expandable container house 20ft / 30ft / 40ft options Kitchen & bathroom package
  • Fold-out side wings create wider interior space while keeping export transport practical.
  • Layouts can include bedrooms, living area, kitchen, dry-wet bathroom and furniture-ready zones.
  • Exterior panels, doors, windows, flooring and electrical scope can be matched to the destination market.
Foldable container house

Folding Container Houses

Folding container houses are designed for compact loading, fast site opening and repeated relocation. They are often selected for worker camps, emergency housing, temporary offices, sanitary units and high-quantity project accommodation.

Folding container house Compact 40HQ loading Reusable temporary building
  • Folded modules reduce transport volume and help control shipping cost for large projects.
  • EPS, rock wool or PU panel packages can be selected for budget, fire and insulation needs.
  • Interior options include basic shell, office-ready layout, accommodation package and wet-area module.
Flat pack container house

Quick Assembly Container Houses

Quick assembly container houses use bolted steel frames, sandwich panels, doors, windows and factory-prepared utility routes. They are a practical option for modular dormitories, site offices, service rooms, shops and multi-unit buildings.

Quick assembly house All-bolted structure 2-3 storey planning
  • Flat-packed components support efficient export and flexible on-site installation.
  • Standard units can be used independently or connected into larger offices, dormitories and service blocks.
  • Wall core, floor finish, opening positions, plumbing and electrical scope can be configured before production.
Space capsule house

Space Capsule Houses

Space capsule houses are complete modular rooms with a distinctive exterior, panoramic glazing and factory-finished interior options. They are used for glamping resorts, scenic accommodation, homestays, cafés, reception rooms and premium outdoor stays.

Space capsule house Panoramic glass facade Whole-unit delivery
  • Completed modules can include bedroom, lounge, bathroom, HVAC, lighting and smart-control options.
  • Site access, crane unloading, support points and utility standards should be confirmed before quotation.
  • Suitable for tourism projects that need a recognizable guest experience and faster on-site placement.
Container house

Container Integrated Houses

Container integrated houses are standardized steel-frame modular buildings for accommodation camps, offices, retail rooms, public-service spaces and connected multi-unit projects. They can be planned as complete units, flat-pack systems or combined buildings.

Container integrated house Standard 20ft module Flat-pack or whole-unit
  • Standard modules simplify camp layout, repeat procurement, spare parts and project scheduling.
  • Units can connect horizontally or stack with planned stairs, corridors, openings and utility routes.
  • Finish levels range from economical camp rooms to office-ready, living-ready and commercial facade packages.
Why Modular Housing

A More Flexible Way to Build Accommodation, Office and Commercial Space

01 / FLEXIBLE

Adaptable Room Layouts

Configure bedrooms, offices, bathrooms, kitchens, meeting rooms, corridors and open commercial spaces around the final application.

02 / EFFICIENT

Multiple Transport Methods

Select folded, flat-pack or complete-unit delivery based on container loading, destination labor, crane access and installation schedule.

03 / PRACTICAL

Factory-Prefabricated Build

Steel frames, panels, doors, windows, flooring and utility routes can be prepared in the factory to reduce wet work on site.

04 / CUSTOM

Project-Specific Materials

Choose wall panel core, insulation level, exterior finish, floor package, door and window type, electrical standard and optional equipment.

How We Support Your Project

From Requirement to Modular Space Solution

Share the basics of your project first. We can then compare modular house types around use, destination, shipping plan, site access, interior scope and budget direction.

STEP 01

Share Application and Site

Tell us the destination country, intended use, quantity, available land, access road and expected installation schedule.

STEP 02

Compare Product Types

Choose between expandable, folding, quick assembly, space capsule and container integrated systems based on project priorities.

STEP 03

Confirm Configuration

Review dimensions, storeys, room layout, wall panel, floor finish, openings, bathroom, kitchen, HVAC and electrical scope.

STEP 04

Prepare a Quotation

After the key details are clear, we can prepare a quotation direction around product model, material package and delivery method.

Not Sure Which Modular House Fits Your Project?

Share your intended use, destination, quantity, room layout, preferred finish level and delivery timeline. We will help you start with the most suitable modular house category and configuration direction.

Request a Quote